CrossCountry at Edinburgh
How this operator is doing here
CrossCountry had 10,505 scheduled stops at Edinburgh in the 13 periods to Period 7 of 2026-27, 4% of the station's total. 70.3% of recorded arrivals came within three minutes and 4.2% of stops were cancelled.
CrossCountry trains at Edinburgh also serve Haymarket (2.0 km west, 65.0% on time, 11.4% cancelled), Inverkeithing (15.8 km north-west, 46.9% on time, 13.6% cancelled), Kirkcaldy (17.9 km north, 48.0% on time, 13.6% cancelled), Markinch (27.9 km north, 47.1% on time, 13.6% cancelled), Ladybank (36.1 km north, 49.4% on time, 13.6% cancelled) and Cupar (42.1 km north, 51.2% on time, 13.6% cancelled), which are the stations on its network closest to Edinburgh.
The busiest CrossCountry station within 30 km of Edinburgh is Haymarket, 2.0 km west, with about 7 scheduled stops a day.
CrossCountry ranks 4th of the 7 operators with enough records at Edinburgh, on 70.3%.
For CrossCountry, Edinburgh is the 23rd best of 99 ranked stations. Its 70.3% here is 7.1 percentage points above the 63.2% across the whole network.
CrossCountry at Edinburgh has slipped sharply. 70.3% of stops came within three minutes of the timetable in the latest 13 periods, 5.2 percentage points worse than the 75.5% recorded in the 13 before. Cancellations held steady at 4.2% of scheduled stops, against 3.9% before.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 709 | 71.8% | 3.0% |
| Period 6 of 2026-27 | 791 | 68.0% | 7.6% |
| Period 5 of 2026-27 | 816 | 66.3% | 2.5% |
| Period 4 of 2026-27 | 815 | 65.5% | 4.3% |
| Period 3 of 2026-27 | 811 | 69.5% | 6.5% |
| Period 2 of 2026-27 | 812 | 69.7% | 4.9% |
| Period 1 of 2026-27 | 931 | 69.8% | 4.6% |
| Period 13 of 2025-26 | 877 | 76.1% | 3.8% |
| Period 12 of 2025-26 | 786 | 72.2% | 2.2% |
| Period 11 of 2025-26 | 806 | 76.2% | 2.0% |
| Period 10 of 2025-26 | 744 | 69.0% | 5.1% |
| Period 9 of 2025-26 | 816 | 66.5% | 4.2% |
| Period 8 of 2025-26 | 791 | 72.3% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Edinburgh
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 223,595 | 87.6% | 1.3% |
| LNER | 22,157 | 72.5% | 2.4% |
| TransPennine Express | 11,018 | 78.5% | 2.6% |
| Avanti | 4,687 | 66.3% | 4.4% |
| Lumo (East Coast) | 3,372 | 68.3% | 2.2% |
| Caledonian Sleeper | 649 | 69.9% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out