Caledonian Sleeper at Edinburgh
All trains at EdinburghCaledonian Sleeper across BritainScotland
How this operator is doing here
Caledonian Sleeper had 649 scheduled stops at Edinburgh in the 13 periods to Period 7 of 2026-27, 0% of the station's total. 69.9% of recorded arrivals came within three minutes and 2.3% of stops were cancelled.
Caledonian Sleeper trains at Edinburgh also serve Inverkeithing (15.8 km north-west, – on time, – cancelled), Kirkcaldy (17.9 km north, – on time, – cancelled), Falkirk Grahamston (37.4 km west, – on time, – cancelled), Carstairs (41.6 km south-west, – on time, – cancelled), Gleneagles (49.1 km north-west, – on time, – cancelled) and Stirling (49.8 km west, – on time, – cancelled), which are the stations on its network closest to Edinburgh.
The busiest Caledonian Sleeper station within 30 km of Edinburgh is Inverkeithing, 15.8 km north-west, with about 0 scheduled stops a day.
Caledonian Sleeper ranks 5th of the 7 operators with enough records at Edinburgh, on 69.9%.
Cancellations of Caledonian Sleeper at Edinburgh are near its usual level: 2.3% of scheduled stops, against 2.3% across its network and 1.6% for every operator at the station.
Alongside Caledonian Sleeper, the other operators at Edinburgh are ScotRail (87.6%, 81% of stops), LNER (72.5%, 8% of stops), TransPennine Express (78.5%, 4% of stops) and CrossCountry (70.3%, 4% of stops), so passengers here can compare several services.
Period by period
See how Caledonian Sleeper Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 54 | – | – |
| Period 6 of 2026-27 | 48 | – | – |
| Period 5 of 2026-27 | 46 | – | – |
| Period 4 of 2026-27 | 49 | – | – |
| Period 3 of 2026-27 | 55 | – | – |
| Period 2 of 2026-27 | 50 | – | – |
| Period 1 of 2026-27 | 73 | 62.0% | 2.7% |
| Period 13 of 2025-26 | 56 | 80.0% | 1.8% |
| Period 12 of 2025-26 | 44 | – | – |
| Period 11 of 2025-26 | 48 | – | – |
| Period 10 of 2025-26 | 38 | – | – |
| Period 9 of 2025-26 | 41 | – | – |
| Period 8 of 2025-26 | 47 | – | – |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Edinburgh
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 223,595 | 87.6% | 1.3% |
| LNER | 22,157 | 72.5% | 2.4% |
| TransPennine Express | 11,018 | 78.5% | 2.6% |
| CrossCountry | 10,505 | 70.3% | 4.2% |
| Avanti | 4,687 | 66.3% | 4.4% |
| Lumo (East Coast) | 3,372 | 68.3% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out