Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

LNER at Durham

All trains at DurhamLNER across BritainNorth East

On time, last 13 periods68.1%Whole station: 69.0%
Cancelled2.4%Whole station: 3.1%
Scheduled stops15,297Of 42,651 at the station

How this operator is doing here

LNER had 15,297 scheduled stops at Durham in the 13 periods to Period 7 of 2026-27, 36% of the station's total. 68.1% of recorded arrivals came within three minutes and 2.4% of stops were cancelled.

LNER trains at Durham also serve Newcastle (21.1 km north, 63.7% on time, 2.3% cancelled), Darlington (28.9 km south, 65.1% on time, 1.9% cancelled), Thornaby (30.4 km south-east, – on time, – cancelled), Middlesbrough (31.5 km south-east, – on time, – cancelled), Morpeth (43.1 km north, 69.4% on time, 1.6% cancelled) and Northallerton (50.5 km south, 63.5% on time, 2.6% cancelled), which are the stations on its network closest to Durham.

The busiest LNER station within 30 km of Durham is Newcastle, 21.1 km north, with about 92 scheduled stops a day.

LNER ranks 3rd of the 4 operators with enough records at Durham, on 68.1%.

For LNER, Durham ranks 14th of 35 stations and is typical: 68.1% here against 67.6% across the network, a difference of 0.5 percentage points.

LNER at Durham has slipped sharply. 68.1% of stops came within three minutes of the timetable in the latest 13 periods, 5.1 percentage points worse than the 73.2% recorded in the 13 before. Cancellations rose to 2.4% of scheduled stops from 1.5%, which is 0.9 percentage points more.

Period by period

60%80%2023-242024-252025-262026-27Period 1 of 2023-24: 77.4%Period 2 of 2023-24: 77.4%Period 3 of 2023-24: 69.9%Period 4 of 2023-24: 74.3%Period 5 of 2023-24: 72.8%Period 6 of 2023-24: 75.7%Period 7 of 2023-24: 65.7%Period 8 of 2023-24: 49.1%Period 9 of 2023-24: 59.6%Period 10 of 2023-24: 59.8%Period 11 of 2023-24: 70.0%Period 12 of 2023-24: 75.3%Period 13 of 2023-24: 75.4%Period 1 of 2024-25: 72.2%Period 2 of 2024-25: 72.5%Period 3 of 2024-25: 73.1%Period 4 of 2024-25: 71.6%Period 5 of 2024-25: 72.2%Period 6 of 2024-25: 72.6%Period 7 of 2024-25: 73.2%Period 8 of 2024-25: 74.5%Period 9 of 2024-25: 63.2%Period 10 of 2024-25: 68.5%Period 11 of 2024-25: 70.5%Period 12 of 2024-25: 77.7%Period 13 of 2024-25: 74.1%Period 1 of 2025-26: 77.0%Period 2 of 2025-26: 72.5%Period 3 of 2025-26: 76.3%Period 4 of 2025-26: 77.2%Period 5 of 2025-26: 67.1%Period 6 of 2025-26: 75.8%Period 7 of 2025-26: 75.5%Period 8 of 2025-26: 69.7%Period 9 of 2025-26: 69.9%Period 10 of 2025-26: 68.8%Period 11 of 2025-26: 68.9%Period 12 of 2025-26: 73.7%Period 13 of 2025-26: 71.2%Period 1 of 2026-27: 65.8%Period 2 of 2026-27: 67.0%Period 3 of 2026-27: 69.1%Period 4 of 2026-27: 66.8%Period 5 of 2026-27: 62.0%Period 6 of 2026-27: 66.1%Period 7 of 2026-27: 66.6%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 1.7%Period 2 of 2023-24: 4.3%Period 3 of 2023-24: 1.6%Period 4 of 2023-24: 1.2%Period 5 of 2023-24: 1.5%Period 6 of 2023-24: 1.0%Period 7 of 2023-24: 1.8%Period 8 of 2023-24: 8.7%Period 9 of 2023-24: 2.1%Period 10 of 2023-24: 5.8%Period 11 of 2023-24: 4.2%Period 12 of 2023-24: 2.7%Period 13 of 2023-24: 3.0%Period 1 of 2024-25: 1.5%Period 2 of 2024-25: 3.2%Period 3 of 2024-25: 2.7%Period 4 of 2024-25: 3.7%Period 5 of 2024-25: 4.5%Period 6 of 2024-25: 1.8%Period 7 of 2024-25: 2.0%Period 8 of 2024-25: 0.3%Period 9 of 2024-25: 2.4%Period 10 of 2024-25: 1.6%Period 11 of 2024-25: 2.4%Period 12 of 2024-25: 0.8%Period 13 of 2024-25: 0.6%Period 1 of 2025-26: 1.4%Period 2 of 2025-26: 1.6%Period 3 of 2025-26: 0.9%Period 4 of 2025-26: 1.6%Period 5 of 2025-26: 3.6%Period 6 of 2025-26: 0.4%Period 7 of 2025-26: 1.8%Period 8 of 2025-26: 1.5%Period 9 of 2025-26: 2.6%Period 10 of 2025-26: 2.0%Period 11 of 2025-26: 2.3%Period 12 of 2025-26: 3.3%Period 13 of 2025-26: 2.0%Period 1 of 2026-27: 2.5%Period 2 of 2026-27: 1.9%Period 3 of 2026-27: 3.3%Period 4 of 2026-27: 1.2%Period 5 of 2026-27: 2.9%Period 6 of 2026-27: 4.2%Period 7 of 2026-27: 1.1%2023-242024-252025-262026-27

See how LNER Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,16466.6%1.1%
Period 6 of 2026-271,17566.1%4.2%
Period 5 of 2026-271,16762.0%2.9%
Period 4 of 2026-271,17166.8%1.2%
Period 3 of 2026-271,17369.1%3.3%
Period 2 of 2026-271,15767.0%1.9%
Period 1 of 2026-271,33765.8%2.5%
Period 13 of 2025-2698271.2%2.0%
Period 12 of 2025-261,16073.7%3.3%
Period 11 of 2025-261,16668.9%2.3%
Period 10 of 2025-261,10968.8%2.0%
Period 9 of 2025-261,23969.9%2.6%
Period 8 of 2025-261,29769.7%1.5%

Time of year

60%70%80%90%P1: 73.0%1P2: 72.2%2P3: 72.4%3P4: 72.7%4P5: 68.4%5P6: 72.7%6P7: 70.5%7P8: 65.1%8P9: 64.5%9P10: 66.1%10P11: 69.8%11P12: 75.6%12P13: 73.7%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Durham

OperatorScheduled stopsWithin 3 minCancelled
CrossCountry13,47564.2%3.8%
TransPennine Express12,55373.4%3.3%
Northern1,32686.5%1.7%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out