CrossCountry had 13,475 scheduled stops at Durham in the 13 periods to Period 7 of 2026-27, 32% of the station's total. 64.2% of recorded arrivals came within three minutes and 3.8% of stops were cancelled.
CrossCountry trains at Durham also serve Newcastle (21.1 km north, 65.1% on time, 3.9% cancelled), Darlington (28.9 km south, 66.1% on time, 3.7% cancelled), Morpeth (43.1 km north, 64.6% on time, 3.2% cancelled), Alnmouth (68.3 km north, 62.2% on time, 3.3% cancelled), York (96.7 km south, 58.4% on time, 3.6% cancelled) and Leeds (109.5 km south, 61.3% on time, 4.8% cancelled), which are the stations on its network closest to Durham.
The busiest CrossCountry station within 30 km of Durham is Newcastle, 21.1 km north, with about 39 scheduled stops a day.
Of the 4 operators with enough records at Durham, CrossCountry is the least punctual, at 64.2%.
For CrossCountry, Durham is the 46th best of 99 ranked stations. Its 64.2% here is 1.0 percentage points above the 63.2% across the whole network.
CrossCountry at Durham has edged up: 64.2% of stops came within three minutes of the timetable in the latest 13 periods, 3.6 percentage points better than the 60.6% of the 13 before. Cancellations rose to 3.8% of scheduled stops from 3.2%, which is 0.6 percentage points more.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,096 | 66.2% | 4.5% |
| Period 6 of 2026-27 | 1,121 | 64.7% | 7.0% |
| Period 5 of 2026-27 | 1,119 | 60.7% | 3.8% |
| Period 4 of 2026-27 | 1,128 | 60.1% | 3.9% |
| Period 3 of 2026-27 | 1,052 | 64.0% | 4.4% |
| Period 2 of 2026-27 | 1,057 | 64.0% | 4.5% |
| Period 1 of 2026-27 | 1,273 | 64.5% | 2.7% |
| Period 13 of 2025-26 | 971 | 71.9% | 3.2% |
| Period 12 of 2025-26 | 972 | 70.5% | 1.4% |
| Period 11 of 2025-26 | 914 | 72.9% | 2.6% |
| Period 10 of 2025-26 | 885 | 62.9% | 5.5% |
| Period 9 of 2025-26 | 927 | 54.1% | 2.8% |
| Period 8 of 2025-26 | 960 | 58.5% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Durham
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 15,297 | 68.1% | 2.4% |
| TransPennine Express | 12,553 | 73.4% | 3.3% |
| Northern | 1,326 | 86.5% | 1.7% |