TransPennine Express at Durham
All trains at DurhamTransPennine Express across BritainNorth East
How this operator is doing here
TransPennine Express had 12,553 scheduled stops at Durham in the 13 periods to Period 7 of 2026-27, 29% of the station's total. 73.4% of recorded arrivals came within three minutes and 3.3% of stops were cancelled.
TransPennine Express trains at Durham also serve Chester-le-Street (8.4 km north, 67.8% on time, 3.3% cancelled), Newcastle (21.1 km north, 77.1% on time, 2.0% cancelled), Darlington (28.9 km south, 74.7% on time, 3.3% cancelled), Thornaby (30.4 km south-east, 70.2% on time, 2.1% cancelled), Eaglescliffe (31.5 km south-east, 68.1% on time, 1.8% cancelled) and Middlesbrough (31.5 km south-east, 72.8% on time, 6.2% cancelled), which are the stations on its network closest to Durham.
Within 30 km of here, TransPennine Express runs best at Newcastle, 21.1 km north (77.1%), and worst at Chester-le-Street, 8.4 km north (67.8%).
The busiest TransPennine Express station within 30 km of Durham is Newcastle, 21.1 km north, with about 49 scheduled stops a day.
TransPennine Express ranks 2nd of the 4 operators with enough records at Durham, on 73.4%.
For TransPennine Express, Durham is the 24th best of 77 ranked stations. Its 73.4% here is 4.6 percentage points above the 68.8% across the whole network.
Over three full railway years TransPennine Express at Durham has improved each time, from 70.2% within three minutes in 2023-24 to 72.0% in 2024-25 and 73.0% in 2025-26.
Period by period
See how TransPennine Express Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 979 | 74.0% | 1.5% |
| Period 6 of 2026-27 | 969 | 77.3% | 1.8% |
| Period 5 of 2026-27 | 979 | 71.5% | 2.8% |
| Period 4 of 2026-27 | 980 | 74.3% | 2.6% |
| Period 3 of 2026-27 | 977 | 79.9% | 1.6% |
| Period 2 of 2026-27 | 983 | 74.9% | 4.3% |
| Period 1 of 2026-27 | 1,121 | 70.5% | 2.9% |
| Period 13 of 2025-26 | 813 | 75.3% | 3.8% |
| Period 12 of 2025-26 | 979 | 77.6% | 1.9% |
| Period 11 of 2025-26 | 982 | 75.9% | 5.3% |
| Period 10 of 2025-26 | 898 | 71.4% | 4.6% |
| Period 9 of 2025-26 | 914 | 63.5% | 4.5% |
| Period 8 of 2025-26 | 979 | 68.2% | 5.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Durham
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 15,297 | 68.1% | 2.4% |
| CrossCountry | 13,475 | 64.2% | 3.8% |
| Northern | 1,326 | 86.5% | 1.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out