Dunblane
DBLScotlandManaged by ScotRail
How this station is performing
Dunblane had 37,745 scheduled stops to Period 7 of 2026-27, about 104 a day. 91.0% of recorded arrivals were within three minutes of the timetable and 1.5% of scheduled stops were cancelled.
Dunblane opened on 23 May 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Dunblane is the oldest; the next oldest, Bridge of Allan, dates from 1848.
The nearest stations to Dunblane are Bridge of Allan (3.3 km south), Stirling (7.6 km south), Alloa (13.3 km south-east), Gleneagles (17.6 km north-east) and Larbert (20.1 km south-east). 2 stations lie within 10 km in all. Of the five, Alloa is the most punctual at 95.6% and Stirling the least at 89.4%, with Dunblane on 91.0%.
Dunblane takes its name from a town called Dunblane, home to about 9,410 people, and the station stands 0.3 km from its centre.
Across the whole run of data, the weakest four-week period for Dunblane was Period 10 of 2023-24, at 87.4%, some time before the latest year. The strongest was Period 13 of 2023-24, at 95.3%, and the two are 7.9 percentage points apart.
2 of 3 stations of a similar size in Scotland are more punctual than Dunblane on 91.0%. The comparison group includes Uddingston (83.6%), Ayr (91.5%) and Camelon (93.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 37,090 | 91.5% | 1.5% |
| Caledonian Sleeper | 607 | – | – |
| LNER | 48 | – | – |
Operators with their own page for this station are linked to it.
Late train at Dunblane? Delay Repay
These operators call at Dunblane and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,944 | 90.5% | 0.7% |
| Period 6 of 2026-27 | 2,904 | 92.2% | 2.1% |
| Period 5 of 2026-27 | 2,946 | 91.6% | 1.8% |
| Period 4 of 2026-27 | 2,945 | 91.6% | 2.0% |
| Period 3 of 2026-27 | 2,942 | 91.9% | 2.1% |
| Period 2 of 2026-27 | 2,942 | 93.7% | 1.9% |
| Period 1 of 2026-27 | 3,394 | 90.8% | 0.9% |
| Period 13 of 2025-26 | 3,008 | 92.4% | 1.9% |
| Period 12 of 2025-26 | 2,728 | 93.2% | 0.9% |
| Period 11 of 2025-26 | 2,939 | 88.5% | 1.3% |
| Period 10 of 2025-26 | 2,506 | 89.5% | 0.7% |
| Period 9 of 2025-26 | 2,776 | 88.9% | 1.4% |
| Period 8 of 2025-26 | 2,771 | 87.4% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Uddingston | 37,521 | 83.6% | 1.4% |
| Ayr | 37,494 | 91.5% | 1.4% |
| Camelon | 37,446 | 93.8% | 0.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out