Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Camelon

CMOScotlandManaged by ScotRail

On time, last 13 periods93.8%Great Britain: 83.6%
Cancelled0.9%Great Britain: 3.2%
Stops a day103Scheduled, on average
Punctuality rank221st of 2,374Among ranked stations

How this station is performing

Camelon had 37,446 scheduled stops to Period 7 of 2026-27, about 103 a day. 93.8% of recorded arrivals were within three minutes of the timetable and 0.9% of scheduled stops were cancelled.

Camelon opened on 15 June 1903 and closed to passengers on 4 September 1967. It reopened on 25 September 1994, 32 years before the latest figures. The First World War closed Camelon on 1 January 1917, and it reopened on 1 February 1919. Of the 5 stations nearest to it with a known opening date, Camelon is the newest; the oldest, Falkirk High, opened in 1842.

The nearest stations to Camelon are Larbert (1.9 km north), Falkirk Grahamston (2.1 km east), Falkirk High (2.3 km south-east), Polmont (6.9 km east) and Cumbernauld (12.4 km south-west). 4 stations lie within 10 km in all. At 93.8%, Camelon is more punctual than every one of them; the best of the five, Falkirk High, manages 93.3%.

Camelon takes its name from a Village called Camelon, home to about 4,508 people, and the station stands 0.2 km from its centre.

Compared with 3 stations of a similar size in Scotland, Camelon is the most punctual, at 93.8%. The comparison group includes Ayr (91.5%), Uddingston (83.6%) and Dunblane (91.0%).

Period by period

80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 95.8%Period 2 of 2023-24: 97.1%Period 3 of 2023-24: 95.0%Period 4 of 2023-24: 95.5%Period 5 of 2023-24: 94.2%Period 6 of 2023-24: 93.9%Period 7 of 2023-24: 93.2%Period 8 of 2023-24: 90.7%Period 9 of 2023-24: 91.3%Period 10 of 2023-24: 91.2%Period 11 of 2023-24: 93.4%Period 12 of 2023-24: 95.0%Period 13 of 2023-24: 96.9%Period 1 of 2024-25: 93.4%Period 2 of 2024-25: 95.9%Period 3 of 2024-25: 94.7%Period 4 of 2024-25: 93.9%Period 5 of 2024-25: 94.5%Period 6 of 2024-25: 95.5%Period 7 of 2024-25: 95.3%Period 8 of 2024-25: 89.6%Period 9 of 2024-25: 91.5%Period 10 of 2024-25: 92.0%Period 11 of 2024-25: 95.2%Period 12 of 2024-25: 95.1%Period 13 of 2024-25: 96.5%Period 1 of 2025-26: 95.5%Period 2 of 2025-26: 94.1%Period 3 of 2025-26: 95.1%Period 4 of 2025-26: 94.5%Period 5 of 2025-26: 92.4%Period 6 of 2025-26: 95.0%Period 7 of 2025-26: 92.7%Period 8 of 2025-26: 90.6%Period 9 of 2025-26: 92.7%Period 10 of 2025-26: 93.9%Period 11 of 2025-26: 92.4%Period 12 of 2025-26: 96.0%Period 13 of 2025-26: 94.7%Period 1 of 2026-27: 94.4%Period 2 of 2026-27: 95.0%Period 3 of 2026-27: 94.5%Period 4 of 2026-27: 93.2%Period 5 of 2026-27: 94.0%Period 6 of 2026-27: 93.9%Period 7 of 2026-27: 93.7%
This pageGreat Britain
0%2%4%Period 1 of 2023-24: 1.0%Period 2 of 2023-24: 1.2%Period 3 of 2023-24: 0.6%Period 4 of 2023-24: 1.1%Period 5 of 2023-24: 1.0%Period 6 of 2023-24: 1.3%Period 7 of 2023-24: 1.6%Period 8 of 2023-24: 2.1%Period 9 of 2023-24: 0.9%Period 10 of 2023-24: 2.7%Period 11 of 2023-24: 1.3%Period 12 of 2023-24: 1.0%Period 13 of 2023-24: 1.1%Period 1 of 2024-25: 1.2%Period 2 of 2024-25: 0.8%Period 3 of 2024-25: 2.9%Period 4 of 2024-25: 2.4%Period 5 of 2024-25: 0.8%Period 6 of 2024-25: 0.5%Period 7 of 2024-25: 0.7%Period 8 of 2024-25: 1.3%Period 9 of 2024-25: 2.4%Period 10 of 2024-25: 2.5%Period 11 of 2024-25: 1.9%Period 12 of 2024-25: 1.7%Period 13 of 2024-25: 0.7%Period 1 of 2025-26: 2.0%Period 2 of 2025-26: 1.0%Period 3 of 2025-26: 1.2%Period 4 of 2025-26: 0.8%Period 5 of 2025-26: 1.4%Period 6 of 2025-26: 0.8%Period 7 of 2025-26: 1.5%Period 8 of 2025-26: 0.7%Period 9 of 2025-26: 0.9%Period 10 of 2025-26: 0.7%Period 11 of 2025-26: 0.8%Period 12 of 2025-26: 0.4%Period 13 of 2025-26: 0.9%Period 1 of 2026-27: 0.9%Period 2 of 2026-27: 1.1%Period 3 of 2026-27: 1.6%Period 4 of 2026-27: 1.6%Period 5 of 2026-27: 0.6%Period 6 of 2026-27: 1.2%Period 7 of 2026-27: 0.5%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
ScotRail37,44693.8%0.9%

Operators with their own page for this station are linked to it.

Late train at Camelon? Delay Repay

These operators call at Camelon and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-272,89693.7%0.5%
Period 6 of 2026-272,74293.9%1.2%
Period 5 of 2026-272,89794.0%0.6%
Period 4 of 2026-272,97193.2%1.6%
Period 3 of 2026-272,89794.5%1.6%
Period 2 of 2026-272,89495.0%1.1%
Period 1 of 2026-273,34994.4%0.9%
Period 13 of 2025-263,16794.7%0.9%
Period 12 of 2025-262,89696.0%0.4%
Period 11 of 2025-262,89692.4%0.8%
Period 10 of 2025-262,42593.9%0.7%
Period 9 of 2025-262,70892.7%0.9%
Period 8 of 2025-262,70890.6%0.7%

Time of year

80%90%100%P1: 94.8%1P2: 95.5%2P3: 94.8%3P4: 94.3%4P5: 93.7%5P6: 94.5%6P7: 93.6%7P8: 90.3%8P9: 91.8%9P10: 92.4%10P11: 93.6%11P12: 95.4%12P13: 96.0%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in Scotland

StationScheduled stopsWithin 3 minCancelled
Ayr37,49491.5%1.4%
Uddingston37,52183.6%1.4%
Dunblane37,74591.0%1.5%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out