ScotRail at Dunblane
How this operator is doing here
ScotRail had 37,090 scheduled stops at Dunblane in the 13 periods to Period 7 of 2026-27, 98% of the station's total. 91.5% of recorded arrivals came within three minutes and 1.5% of stops were cancelled.
ScotRail trains at Dunblane also serve Bridge of Allan (3.3 km south, – on time, 1.4% cancelled), Stirling (7.6 km south, 90.0% on time, 1.2% cancelled), Alloa (13.3 km south-east, 95.6% on time, 1.4% cancelled), Gleneagles (17.6 km north-east, – on time, 1.3% cancelled), Larbert (20.1 km south-east, 92.7% on time, 0.8% cancelled) and Camelon (22.0 km south-east, 93.8% on time, 0.9% cancelled), which are the stations on its network closest to Dunblane.
Within 30 km of here, ScotRail runs best at Alloa, 13.3 km south-east (95.6%), and worst at Cumbernauld, 27.1 km south (87.9%).
The busiest ScotRail station within 30 km of Dunblane is Stirling, 7.6 km south, with about 214 scheduled stops a day.
Of the 1 operators with enough records at Dunblane, ScotRail is the most punctual, at 91.5%.
For ScotRail, Dunblane is the 80th best of 312 ranked stations. Its 91.5% here is 3.6 percentage points above the 87.9% across the whole network.
Cancellations of ScotRail at Dunblane are near its usual level: 1.5% of scheduled stops, against 1.6% across its network and 1.5% for every operator at the station.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,892 | 91.2% | 0.7% |
| Period 6 of 2026-27 | 2,855 | 92.3% | 2.2% |
| Period 5 of 2026-27 | 2,894 | 92.2% | 1.6% |
| Period 4 of 2026-27 | 2,893 | 91.9% | 2.0% |
| Period 3 of 2026-27 | 2,893 | 92.4% | 2.1% |
| Period 2 of 2026-27 | 2,890 | 94.1% | 1.9% |
| Period 1 of 2026-27 | 3,337 | 91.2% | 0.8% |
| Period 13 of 2025-26 | 2,954 | 93.0% | 1.9% |
| Period 12 of 2025-26 | 2,682 | 93.4% | 0.9% |
| Period 11 of 2025-26 | 2,888 | 89.1% | 1.3% |
| Period 10 of 2025-26 | 2,464 | 90.2% | 0.7% |
| Period 9 of 2025-26 | 2,724 | 89.8% | 1.5% |
| Period 8 of 2025-26 | 2,724 | 88.0% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Dunblane
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Caledonian Sleeper | 607 | – | – |
| LNER | 48 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out