ScotRail at Dunbar
How this operator is doing here
ScotRail had 3,542 scheduled stops at Dunbar in the 13 periods to Period 7 of 2026-27, 24% of the station's total. 83.6% of recorded arrivals came within three minutes and 0.6% of stops were cancelled.
ScotRail trains at Dunbar also serve East Linton (9.4 km west, 80.9% on time, 0.6% cancelled), North Berwick (15.0 km north-west, 91.6% on time, 0.9% cancelled), Drem (16.9 km west, 84.5% on time, 0.8% cancelled), Longniddry (23.5 km west, 86.6% on time, 0.8% cancelled), Prestonpans (29.2 km west, 87.1% on time, 0.7% cancelled) and Wallyford (31.8 km west, 86.9% on time, 0.7% cancelled), which are the stations on its network closest to Dunbar.
Within 30 km of here, ScotRail runs best at North Berwick, 15.0 km north-west (91.6%), and worst at East Linton, 9.4 km west (80.9%).
The busiest ScotRail station within 30 km of Dunbar is Prestonpans, 29.2 km west, with about 40 scheduled stops a day.
Of the 4 operators with enough records at Dunbar, ScotRail is the most punctual, at 83.6%.
ScotRail at Dunbar has slipped a little, from 87.8% within three minutes in the previous 13 periods to 83.6% in the latest 13, a fall of 4.2 percentage points. Cancellations fell to 0.6% of scheduled stops from 1.1%, which is 0.5 percentage points fewer.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 267 | 83.7% | 1.1% |
| Period 6 of 2026-27 | 267 | 81.6% | 0.4% |
| Period 5 of 2026-27 | 276 | 77.4% | 0.7% |
| Period 4 of 2026-27 | 276 | 82.1% | 1.1% |
| Period 3 of 2026-27 | 276 | 85.7% | 1.4% |
| Period 2 of 2026-27 | 276 | 84.1% | 0.0% |
| Period 1 of 2026-27 | 321 | 83.4% | 0.3% |
| Period 13 of 2025-26 | 300 | 85.6% | 0.7% |
| Period 12 of 2025-26 | 276 | 85.9% | 0.0% |
| Period 11 of 2025-26 | 276 | 85.9% | 0.0% |
| Period 10 of 2025-26 | 219 | 80.6% | 0.9% |
| Period 9 of 2025-26 | 256 | 85.0% | 0.8% |
| Period 8 of 2025-26 | 256 | 85.2% | 0.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Dunbar
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 5,380 | 75.5% | 1.7% |
| LNER | 3,297 | 75.9% | 1.4% |
| CrossCountry | 2,353 | 58.3% | 3.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out