CrossCountry at Dunbar
How this operator is doing here
CrossCountry had 2,353 scheduled stops at Dunbar in the 13 periods to Period 7 of 2026-27, 16% of the station's total. 58.3% of recorded arrivals came within three minutes and 3.7% of stops were cancelled.
CrossCountry trains at Dunbar also serve Berwick-upon-Tweed (40.0 km south-east, 67.4% on time, 3.3% cancelled), Edinburgh (42.4 km west, 70.3% on time, 4.2% cancelled), Kirkcaldy (42.5 km west, 48.0% on time, 13.6% cancelled), Haymarket (44.3 km west, 65.0% on time, 11.4% cancelled), Markinch (44.4 km north-west, 47.1% on time, 13.6% cancelled) and Cupar (46.9 km north-west, 51.2% on time, 13.6% cancelled), which are the stations on its network closest to Dunbar.
Of the 4 operators with enough records at Dunbar, CrossCountry is the least punctual, at 58.3%.
For CrossCountry, Dunbar is the 74th best of 99 ranked stations. Its 58.3% here is 4.9 percentage points below the 63.2% across the whole network.
CrossCountry at Dunbar has slipped sharply. 58.3% of stops came within three minutes of the timetable in the latest 13 periods, 8.9 percentage points worse than the 67.2% recorded in the 13 before. Cancellations fell to 3.7% of scheduled stops from 4.4%, which is 0.7 percentage points fewer.
CrossCountry at Dunbar has not moved in one direction over three full railway years: 66.3% within three minutes in 2023-24, 70.7% in 2024-25 and 64.9% in 2025-26.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 159 | 59.5% | 3.8% |
| Period 6 of 2026-27 | 181 | 56.2% | 6.6% |
| Period 5 of 2026-27 | 188 | 46.2% | 1.1% |
| Period 4 of 2026-27 | 188 | 55.2% | 3.7% |
| Period 3 of 2026-27 | 185 | 54.0% | 5.9% |
| Period 2 of 2026-27 | 188 | 57.9% | 2.7% |
| Period 1 of 2026-27 | 216 | 54.8% | 3.7% |
| Period 13 of 2025-26 | 203 | 67.3% | 3.4% |
| Period 12 of 2025-26 | 168 | 61.4% | 1.2% |
| Period 11 of 2025-26 | 188 | 62.5% | 2.1% |
| Period 10 of 2025-26 | 167 | 59.9% | 6.0% |
| Period 9 of 2025-26 | 164 | 59.2% | 4.3% |
| Period 8 of 2025-26 | 158 | 65.4% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Dunbar
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 5,380 | 75.5% | 1.7% |
| ScotRail | 3,542 | 83.6% | 0.6% |
| LNER | 3,297 | 75.9% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out