LNER at Dunbar
How this operator is doing here
LNER had 3,297 scheduled stops at Dunbar in the 13 periods to Period 7 of 2026-27, 23% of the station's total. 75.9% of recorded arrivals came within three minutes and 1.4% of stops were cancelled.
LNER trains at Dunbar also serve Reston (25.9 km south-east, 87.0% on time, 0.9% cancelled), Berwick-upon-Tweed (40.0 km south-east, 64.2% on time, 1.2% cancelled), Edinburgh (42.4 km west, 72.5% on time, 2.4% cancelled), Kirkcaldy (42.5 km west, 61.6% on time, 1.7% cancelled), Haymarket (44.3 km west, 51.2% on time, 1.3% cancelled) and Leuchars (For St. Andrews) (48.0 km north-west, 61.0% on time, 1.6% cancelled), which are the stations on its network closest to Dunbar.
The busiest LNER station within 30 km of Dunbar is Reston, 25.9 km south-east, with about 2 scheduled stops a day.
LNER ranks 2nd of the 4 operators with enough records at Dunbar, on 75.9%.
For LNER, Dunbar is the 6th best of 35 ranked stations. Its 75.9% here is 8.3 percentage points above the 67.6% across the whole network.
LNER cancels fewer trains at Dunbar than elsewhere: 1.4% of scheduled stops, against 2.9% across its network and 1.7% for every operator at the station.
LNER at Dunbar has not moved in one direction over three full railway years: 73.8% within three minutes in 2023-24, 76.3% in 2024-25 and 74.6% in 2025-26.
Period by period
See how LNER Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 223 | 77.8% | 0.9% |
| Period 6 of 2026-27 | 251 | 77.2% | 2.0% |
| Period 5 of 2026-27 | 260 | 74.9% | 0.4% |
| Period 4 of 2026-27 | 260 | 78.5% | 1.5% |
| Period 3 of 2026-27 | 260 | 78.7% | 2.7% |
| Period 2 of 2026-27 | 256 | 75.9% | 1.2% |
| Period 1 of 2026-27 | 298 | 74.2% | 1.0% |
| Period 13 of 2025-26 | 283 | 81.1% | 1.1% |
| Period 12 of 2025-26 | 260 | 82.0% | 1.9% |
| Period 11 of 2025-26 | 259 | 75.4% | 1.2% |
| Period 10 of 2025-26 | 221 | 73.9% | 1.4% |
| Period 9 of 2025-26 | 233 | 64.3% | 2.6% |
| Period 8 of 2025-26 | 233 | 71.4% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Dunbar
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 5,380 | 75.5% | 1.7% |
| ScotRail | 3,542 | 83.6% | 0.6% |
| CrossCountry | 2,353 | 58.3% | 3.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out