TransPennine Express at Dunbar
All trains at DunbarTransPennine Express across BritainScotland
How this operator is doing here
TransPennine Express had 5,380 scheduled stops at Dunbar in the 13 periods to Period 7 of 2026-27, 37% of the station's total. 75.5% of recorded arrivals came within three minutes and 1.7% of stops were cancelled.
TransPennine Express trains at Dunbar also serve East Linton (9.4 km west, 74.9% on time, 1.7% cancelled), Reston (25.9 km south-east, 75.6% on time, 1.7% cancelled), Berwick-upon-Tweed (40.0 km south-east, 78.1% on time, 1.7% cancelled), Edinburgh (42.4 km west, 78.5% on time, 2.6% cancelled), Haymarket (44.3 km west, 71.8% on time, 3.7% cancelled) and Carstairs (79.8 km south-west, 82.3% on time, 0.0% cancelled), which are the stations on its network closest to Dunbar.
The busiest TransPennine Express station within 30 km of Dunbar is Reston, 25.9 km south-east, with about 15 scheduled stops a day.
TransPennine Express ranks 3rd of the 4 operators with enough records at Dunbar, on 75.5%.
For TransPennine Express, Dunbar is the 18th best of 77 ranked stations. Its 75.5% here is 6.7 percentage points above the 68.8% across the whole network.
TransPennine Express at Dunbar has slipped sharply. 75.5% of stops came within three minutes of the timetable in the latest 13 periods, 7.3 percentage points worse than the 82.8% recorded in the 13 before. Cancellations fell to 1.7% of scheduled stops from 2.4%, which is 0.7 percentage points fewer.
Period by period
See how TransPennine Express Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 374 | 70.6% | 0.0% |
| Period 6 of 2026-27 | 425 | 76.9% | 2.1% |
| Period 5 of 2026-27 | 456 | 69.4% | 1.1% |
| Period 4 of 2026-27 | 412 | 71.2% | 3.2% |
| Period 3 of 2026-27 | 415 | 75.7% | 0.7% |
| Period 2 of 2026-27 | 416 | 79.5% | 4.8% |
| Period 1 of 2026-27 | 470 | 75.2% | 1.5% |
| Period 13 of 2025-26 | 456 | 78.9% | 0.2% |
| Period 12 of 2025-26 | 416 | 77.2% | 3.1% |
| Period 11 of 2025-26 | 416 | 78.3% | 1.4% |
| Period 10 of 2025-26 | 370 | 72.2% | 0.0% |
| Period 9 of 2025-26 | 378 | 76.9% | 1.6% |
| Period 8 of 2025-26 | 376 | 79.6% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Dunbar
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 3,542 | 83.6% | 0.6% |
| LNER | 3,297 | 75.9% | 1.4% |
| CrossCountry | 2,353 | 58.3% | 3.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out