Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Great Western Railway at Didcot Parkway

All trains at Didcot ParkwayGreat Western Railway across BritainSouth East

On time, last 13 periods70.8%Whole station: 70.8%
Cancelled3.4%Whole station: 3.4%
Scheduled stops88,100Of 88,376 at the station

How this operator is doing here

Great Western Railway had 88,100 scheduled stops at Didcot Parkway in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 70.8% of recorded arrivals came within three minutes and 3.4% of stops were cancelled.

Great Western Railway trains at Didcot Parkway also serve Appleford (3.1 km north, 76.1% on time, 4.5% cancelled), Culham (4.7 km north, 73.3% on time, 4.6% cancelled), Cholsey (7.4 km south-east, 78.9% on time, 2.4% cancelled), Radley (8.3 km north, 71.1% on time, 4.5% cancelled), Goring and Streatley (12.5 km south-east, 80.5% on time, 2.4% cancelled) and Oxford (15.9 km north, 72.1% on time, 4.6% cancelled), which are the stations on its network closest to Didcot Parkway.

Within 30 km of here, Great Western Railway runs best at Henley-on-Thames, 25.2 km east (98.1%), and worst at Hanborough, 25.4 km north (60.5%).

The busiest Great Western Railway station within 30 km of Didcot Parkway is Reading, 25.2 km south-east, with about 546 scheduled stops a day.

Great Western Railway at Didcot Parkway has slipped a little, from 74.6% within three minutes in the previous 13 periods to 70.8% in the latest 13, a fall of 3.8 percentage points. Cancellations held steady at 3.4% of scheduled stops, against 3.2% before.

Period by period

60%70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 69.1%Period 2 of 2023-24: 73.2%Period 3 of 2023-24: 72.9%Period 4 of 2023-24: 73.9%Period 5 of 2023-24: 71.5%Period 6 of 2023-24: 72.0%Period 7 of 2023-24: 75.6%Period 8 of 2023-24: 70.8%Period 9 of 2023-24: 65.1%Period 10 of 2023-24: 67.9%Period 11 of 2023-24: 68.5%Period 12 of 2023-24: 71.9%Period 13 of 2023-24: 70.7%Period 1 of 2024-25: 78.3%Period 2 of 2024-25: 74.8%Period 3 of 2024-25: 75.7%Period 4 of 2024-25: 71.6%Period 5 of 2024-25: 75.7%Period 6 of 2024-25: 77.2%Period 7 of 2024-25: 71.3%Period 8 of 2024-25: 70.0%Period 9 of 2024-25: 63.0%Period 10 of 2024-25: 76.8%Period 11 of 2024-25: 76.8%Period 12 of 2024-25: 78.0%Period 13 of 2024-25: 78.0%Period 1 of 2025-26: 78.4%Period 2 of 2025-26: 79.2%Period 3 of 2025-26: 78.1%Period 4 of 2025-26: 71.4%Period 5 of 2025-26: 77.2%Period 6 of 2025-26: 72.4%Period 7 of 2025-26: 69.9%Period 8 of 2025-26: 66.3%Period 9 of 2025-26: 63.1%Period 10 of 2025-26: 71.1%Period 11 of 2025-26: 75.6%Period 12 of 2025-26: 79.3%Period 13 of 2025-26: 77.4%Period 1 of 2026-27: 76.9%Period 2 of 2026-27: 72.2%Period 3 of 2026-27: 70.1%Period 4 of 2026-27: 64.9%Period 5 of 2026-27: 64.4%Period 6 of 2026-27: 67.2%Period 7 of 2026-27: 70.1%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 3.6%Period 2 of 2023-24: 4.4%Period 3 of 2023-24: 3.5%Period 4 of 2023-24: 2.4%Period 5 of 2023-24: 4.0%Period 6 of 2023-24: 3.5%Period 7 of 2023-24: 2.6%Period 8 of 2023-24: 3.9%Period 9 of 2023-24: 5.2%Period 10 of 2023-24: 8.6%Period 11 of 2023-24: 4.5%Period 12 of 2023-24: 3.4%Period 13 of 2023-24: 2.4%Period 1 of 2024-25: 1.9%Period 2 of 2024-25: 3.3%Period 3 of 2024-25: 3.5%Period 4 of 2024-25: 3.9%Period 5 of 2024-25: 2.4%Period 6 of 2024-25: 2.8%Period 7 of 2024-25: 3.9%Period 8 of 2024-25: 3.2%Period 9 of 2024-25: 5.9%Period 10 of 2024-25: 3.7%Period 11 of 2024-25: 2.1%Period 12 of 2024-25: 2.5%Period 13 of 2024-25: 2.9%Period 1 of 2025-26: 3.1%Period 2 of 2025-26: 1.6%Period 3 of 2025-26: 3.5%Period 4 of 2025-26: 4.0%Period 5 of 2025-26: 2.3%Period 6 of 2025-26: 4.4%Period 7 of 2025-26: 2.1%Period 8 of 2025-26: 4.0%Period 9 of 2025-26: 3.2%Period 10 of 2025-26: 3.7%Period 11 of 2025-26: 2.9%Period 12 of 2025-26: 1.7%Period 13 of 2025-26: 2.2%Period 1 of 2026-27: 2.7%Period 2 of 2026-27: 2.6%Period 3 of 2026-27: 4.4%Period 4 of 2026-27: 3.8%Period 5 of 2026-27: 5.8%Period 6 of 2026-27: 4.0%Period 7 of 2026-27: 4.0%2023-242024-252025-262026-27

See how Great Western Railway Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-276,66670.1%4.0%
Period 6 of 2026-276,68767.2%4.0%
Period 5 of 2026-276,74264.4%5.8%
Period 4 of 2026-276,80164.9%3.8%
Period 3 of 2026-276,75670.1%4.4%
Period 2 of 2026-276,82872.2%2.6%
Period 1 of 2026-277,83576.9%2.7%
Period 13 of 2025-267,46177.4%2.2%
Period 12 of 2025-266,45779.3%1.7%
Period 11 of 2025-266,38175.6%2.9%
Period 10 of 2025-265,89771.1%3.7%
Period 9 of 2025-266,75663.1%3.2%
Period 8 of 2025-266,83366.3%4.0%

Time of year

60%70%80%90%P1: 75.9%1P2: 75.0%2P3: 74.3%3P4: 70.5%4P5: 72.3%5P6: 72.2%6P7: 71.7%7P8: 69.1%8P9: 63.7%9P10: 72.0%10P11: 73.7%11P12: 76.4%12P13: 75.4%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Didcot Parkway

OperatorScheduled stopsWithin 3 minCancelled
CrossCountry27689.7%3.4%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out