ScotRail at Dalwhinnie
How this operator is doing here
ScotRail had 3,371 scheduled stops at Dalwhinnie in the 13 periods to Period 7 of 2026-27, 85% of the station's total. 51.9% of recorded arrivals came within three minutes and 1.2% of stops were cancelled.
ScotRail trains at Dalwhinnie also serve Newtonmore (15.8 km north-east, – on time, 1.0% cancelled), Kingussie (19.7 km north-east, 60.5% on time, 1.1% cancelled), Tulloch (28.2 km west, – on time, 0.6% cancelled), Blair Atholl (30.6 km south-east, 53.8% on time, 1.1% cancelled), Corrour (33.3 km south-west, – on time, 0.6% cancelled) and Rannoch (34.2 km south-west, 70.3% on time, 0.6% cancelled), which are the stations on its network closest to Dalwhinnie.
The busiest ScotRail station within 30 km of Dalwhinnie is Kingussie, 19.7 km north-east, with about 20 scheduled stops a day.
Of the 1 operators with enough records at Dalwhinnie, ScotRail is the most punctual, at 51.9%.
Dalwhinnie is the least punctual station on the ScotRail network, out of 312 ranked stations: 51.9% here against 87.9% across the whole network, which is 36.0 percentage points worse.
Over three full railway years ScotRail at Dalwhinnie has got worse each time, from 59.0% within three minutes in 2023-24 to 54.4% in 2024-25 and 50.8% in 2025-26.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 260 | 38.3% | 1.5% |
| Period 6 of 2026-27 | 260 | 55.2% | 0.4% |
| Period 5 of 2026-27 | 260 | 53.6% | 3.1% |
| Period 4 of 2026-27 | 260 | 48.5% | 0.0% |
| Period 3 of 2026-27 | 260 | 59.8% | 0.4% |
| Period 2 of 2026-27 | 260 | 58.6% | 1.5% |
| Period 1 of 2026-27 | 300 | 64.4% | 2.7% |
| Period 13 of 2025-26 | 285 | 65.5% | 0.4% |
| Period 12 of 2025-26 | 260 | 58.3% | 0.4% |
| Period 11 of 2025-26 | 260 | 46.5% | 2.3% |
| Period 10 of 2025-26 | 221 | 48.2% | 0.5% |
| Period 9 of 2025-26 | 260 | 43.4% | 0.8% |
| Period 8 of 2025-26 | 225 | 27.5% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Dalwhinnie
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Caledonian Sleeper | 618 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out