Great Western Railway had 22,770 scheduled stops at Cheltenham Spa in the 13 periods to Period 7 of 2026-27, 36% of the station's total. 66.7% of recorded arrivals came within three minutes and 5.3% of stops were cancelled.
Great Western Railway trains at Cheltenham Spa also serve Gloucester (10.1 km west, 73.0% on time, 4.9% cancelled), Ashchurch for Tewkesbury (11.4 km north, 62.5% on time, 4.5% cancelled), Stroud (Gloucs) (18.8 km south-west, 67.7% on time, 3.4% cancelled), Stonehouse (20.8 km south-west, 73.0% on time, 3.4% cancelled), Evesham (24.8 km north-east, 58.0% on time, 4.4% cancelled) and Kemble (25.1 km south, 65.7% on time, 3.4% cancelled), which are the stations on its network closest to Cheltenham Spa.
Within 30 km of here, Great Western Railway runs best at Cam and Dursley, 26.7 km south-west (75.0%), and worst at Moreton-in-Marsh, 29.4 km east (56.4%).
The busiest Great Western Railway station within 30 km of Cheltenham Spa is Gloucester, 10.1 km west, with about 99 scheduled stops a day.
Great Western Railway at Cheltenham Spa has slipped sharply. 66.7% of stops came within three minutes of the timetable in the latest 13 periods, 6.6 percentage points worse than the 73.3% recorded in the 13 before. Cancellations fell to 5.3% of scheduled stops from 6.1%, which is 0.8 percentage points fewer.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,479 | 58.7% | 5.3% |
| Period 6 of 2026-27 | 1,761 | 62.7% | 6.2% |
| Period 5 of 2026-27 | 1,775 | 62.0% | 8.2% |
| Period 4 of 2026-27 | 1,758 | 65.2% | 6.6% |
| Period 3 of 2026-27 | 1,761 | 65.0% | 9.4% |
| Period 2 of 2026-27 | 1,772 | 69.2% | 3.9% |
| Period 1 of 2026-27 | 1,910 | 72.7% | 2.5% |
| Period 13 of 2025-26 | 1,969 | 69.9% | 2.5% |
| Period 12 of 2025-26 | 1,778 | 75.8% | 3.5% |
| Period 11 of 2025-26 | 1,764 | 74.9% | 3.2% |
| Period 10 of 2025-26 | 1,594 | 69.7% | 7.1% |
| Period 9 of 2025-26 | 1,768 | 56.2% | 5.8% |
| Period 8 of 2025-26 | 1,681 | 61.6% | 5.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Cheltenham Spa
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 30,538 | 60.3% | 6.8% |
| Transport for Wales | 9,721 | 69.1% | 7.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out