Transport for Wales at Cheltenham Spa
All trains at Cheltenham SpaTransport for Wales across BritainSouth West
How this operator is doing here
Transport for Wales had 9,721 scheduled stops at Cheltenham Spa in the 13 periods to Period 7 of 2026-27, 15% of the station's total. 69.1% of recorded arrivals came within three minutes and 7.8% of stops were cancelled.
Transport for Wales trains at Cheltenham Spa also serve Gloucester (10.1 km west, 72.1% on time, 5.7% cancelled), Lydney (35.9 km south-west, 65.8% on time, 3.8% cancelled), Hereford (45.5 km north-west, 71.5% on time, 2.2% cancelled), Chepstow (48.6 km south-west, 68.6% on time, 3.5% cancelled), Leominster (56.5 km north-west, 66.3% on time, 3.1% cancelled) and Caldicot (57.2 km south-west, 69.5% on time, 3.4% cancelled), which are the stations on its network closest to Cheltenham Spa.
The busiest Transport for Wales station within 30 km of Cheltenham Spa is Gloucester, 10.1 km west, with about 29 scheduled stops a day.
Of the 3 operators with enough records at Cheltenham Spa, Transport for Wales is the most punctual, at 69.1%.
Transport for Wales at Cheltenham Spa has slipped a little, from 71.7% within three minutes in the previous 13 periods to 69.1% in the latest 13, a fall of 2.6 percentage points. Cancellations held steady at 7.8% of scheduled stops, against 7.9% before.
Over three full railway years Transport for Wales at Cheltenham Spa has improved each time, from 61.0% within three minutes in 2023-24 to 68.7% in 2024-25 and 73.5% in 2025-26.
Period by period
See how Transport for Wales Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 672 | 49.7% | 7.1% |
| Period 6 of 2026-27 | 723 | 67.1% | 12.4% |
| Period 5 of 2026-27 | 645 | 48.9% | 22.3% |
| Period 4 of 2026-27 | 663 | 63.1% | 11.8% |
| Period 3 of 2026-27 | 798 | 72.8% | 5.9% |
| Period 2 of 2026-27 | 796 | 68.2% | 8.0% |
| Period 1 of 2026-27 | 916 | 77.9% | 5.3% |
| Period 13 of 2025-26 | 865 | 74.7% | 4.0% |
| Period 12 of 2025-26 | 796 | 78.5% | 4.8% |
| Period 11 of 2025-26 | 792 | 81.2% | 2.5% |
| Period 10 of 2025-26 | 714 | 68.7% | 7.0% |
| Period 9 of 2025-26 | 666 | 60.2% | 10.5% |
| Period 8 of 2025-26 | 675 | 71.7% | 4.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Cheltenham Spa
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 30,538 | 60.3% | 6.8% |
| Great Western Railway | 22,770 | 66.7% | 5.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out