Bristol Parkway
BPWSouth WestManaged by Great Western Railway
How this station is performing
Bristol Parkway had 64,046 scheduled stops to Period 7 of 2026-27, about 176 a day. 66.2% of recorded arrivals were within three minutes of the timetable and 4.5% of scheduled stops were cancelled.
Bristol Parkway opened on 1 May 1972, 54 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Bristol Parkway is the newest; the oldest, Filton Abbey Wood, opened in 1863.
The nearest stations to Bristol Parkway are Filton Abbey Wood (1.9 km south-west), Patchway (1.9 km north-west), Ashley Down (4.6 km south-west), Stapleton Road (5.4 km south) and Montpelier (6.0 km south-west). 15 stations lie within 10 km in all. At 66.2%, Bristol Parkway is less punctual than all of them; the best of the five, Ashley Down, manages 84.7%.
Bristol Parkway is a parkway station, 7.7 km from the centre of Bristol, a big city, home to about 472,465 people, which gives it its name.
2 operators call at Bristol Parkway: Great Western Railway (69.6%, 68% of stops) and CrossCountry (59.0%, 32% of stops). The operator you travel with matters: Great Western Railway reaches 69.6% within three minutes while CrossCountry manages 59.0%, a gap of 10.6 percentage points.
1 of 3 stations of a similar size in South West are more punctual than Bristol Parkway on 66.2%. The comparison group includes Swindon (Wilts) (63.3%), Cheltenham Spa (64.0%) and Newton Abbot (71.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 43,641 | 69.6% | 4.5% |
| CrossCountry | 20,405 | 59.0% | 4.7% |
Operators with their own page for this station are linked to it.
Late train at Bristol Parkway? Delay Repay
These operators call at Bristol Parkway and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,871 | 63.7% | 4.0% |
| Period 6 of 2026-27 | 4,989 | 56.9% | 7.4% |
| Period 5 of 2026-27 | 4,778 | 56.1% | 6.7% |
| Period 4 of 2026-27 | 4,516 | 61.5% | 4.9% |
| Period 3 of 2026-27 | 4,880 | 68.0% | 5.4% |
| Period 2 of 2026-27 | 4,970 | 68.0% | 4.1% |
| Period 1 of 2026-27 | 5,604 | 73.0% | 2.4% |
| Period 13 of 2025-26 | 5,491 | 73.6% | 2.5% |
| Period 12 of 2025-26 | 4,936 | 76.9% | 2.6% |
| Period 11 of 2025-26 | 4,824 | 73.7% | 3.3% |
| Period 10 of 2025-26 | 4,307 | 64.8% | 5.2% |
| Period 9 of 2025-26 | 4,957 | 55.4% | 7.6% |
| Period 8 of 2025-26 | 4,923 | 65.6% | 3.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Swindon (Wilts) | 64,033 | 63.3% | 3.6% |
| Cheltenham Spa | 63,029 | 64.0% | 6.4% |
| Newton Abbot | 58,484 | 71.8% | 4.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out