CrossCountry at Cheltenham Spa
All trains at Cheltenham SpaCrossCountry across BritainSouth West
How this operator is doing here
CrossCountry had 30,538 scheduled stops at Cheltenham Spa in the 13 periods to Period 7 of 2026-27, 48% of the station's total. 60.3% of recorded arrivals came within three minutes and 6.8% of stops were cancelled.
CrossCountry trains at Cheltenham Spa also serve Gloucester (10.1 km west, 68.9% on time, 11.9% cancelled), Ashchurch for Tewkesbury (11.4 km north, 55.8% on time, 9.3% cancelled), Worcestershire Parkway (29.1 km north, 62.1% on time, 7.8% cancelled), Worcester Shrub Hill (34.0 km north, – on time, – cancelled), Lydney (35.9 km south-west, 74.7% on time, 13.3% cancelled) and Yate (45.7 km south-west, – on time, – cancelled), which are the stations on its network closest to Cheltenham Spa.
The busiest CrossCountry station within 30 km of Cheltenham Spa is Worcestershire Parkway, 29.1 km north, with about 50 scheduled stops a day.
Of the 3 operators with enough records at Cheltenham Spa, CrossCountry is the least punctual, at 60.3%.
For CrossCountry, Cheltenham Spa is the 59th best of 99 ranked stations. Its 60.3% here is 2.9 percentage points below the 63.2% across the whole network.
CrossCountry at Cheltenham Spa has slipped sharply. 60.3% of stops came within three minutes of the timetable in the latest 13 periods, 7.0 percentage points worse than the 67.3% recorded in the 13 before. Cancellations held steady at 6.8% of scheduled stops, against 6.6% before.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,028 | 49.1% | 7.2% |
| Period 6 of 2026-27 | 2,382 | 52.1% | 10.2% |
| Period 5 of 2026-27 | 2,259 | 52.0% | 5.8% |
| Period 4 of 2026-27 | 2,383 | 53.9% | 7.2% |
| Period 3 of 2026-27 | 2,255 | 59.5% | 6.2% |
| Period 2 of 2026-27 | 2,380 | 60.0% | 8.5% |
| Period 1 of 2026-27 | 2,672 | 68.4% | 3.2% |
| Period 13 of 2025-26 | 2,630 | 67.0% | 3.8% |
| Period 12 of 2025-26 | 2,392 | 72.0% | 3.6% |
| Period 11 of 2025-26 | 2,339 | 74.4% | 5.8% |
| Period 10 of 2025-26 | 2,126 | 62.3% | 11.9% |
| Period 9 of 2025-26 | 2,384 | 49.6% | 10.7% |
| Period 8 of 2025-26 | 2,308 | 58.6% | 5.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Cheltenham Spa
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 22,770 | 66.7% | 5.3% |
| Transport for Wales | 9,721 | 69.1% | 7.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out