Carnoustie
CANScotlandManaged by ScotRail
How this station is performing
Carnoustie had 14,183 scheduled stops to Period 7 of 2026-27, about 39 a day. 69.0% of recorded arrivals were within three minutes of the timetable and 1.9% of scheduled stops were cancelled.
Carnoustie opened on 8 October 1838, 188 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Carnoustie is the oldest; the next oldest, Monifieth, dates from 1838.
The nearest stations to Carnoustie are Golf Street (0.9 km west), Barry Links (2.6 km west), Monifieth (7.3 km west), Balmossie (8.7 km west) and Arbroath (9.7 km north-east). 5 stations lie within 10 km in all.
Carnoustie takes its name from a town called Carnoustie, home to about 11,394 people, and the station stands 0.6 km from its centre.
Across the whole run of data, the weakest four-week period for Carnoustie was Period 12 of 2023-24, at 44.4%, some time before the latest year. The strongest was Period 6 of 2023-24, at 85.7%, and the two are 41.3 percentage points apart. Cancellations peaked at 10.4% of scheduled stops in Period 8 of 2023-24, against 1.9% over the latest 13 periods.
2 of 3 stations of a similar size in Scotland are more punctual than Carnoustie on 69.0%. The comparison group includes Lockerbie (56.2%), Longniddry (86.6%) and North Berwick (91.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 13,898 | 68.9% | 1.9% |
| Caledonian Sleeper | 284 | – | – |
| LNER | 1 | – | – |
Operators with their own page for this station are linked to it.
Late train at Carnoustie? Delay Repay
These operators call at Carnoustie and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,094 | 66.5% | 0.9% |
| Period 6 of 2026-27 | 1,094 | 75.5% | 0.9% |
| Period 5 of 2026-27 | 1,096 | 69.6% | 2.5% |
| Period 4 of 2026-27 | 1,096 | 73.0% | 2.3% |
| Period 3 of 2026-27 | 1,093 | 75.8% | 1.5% |
| Period 2 of 2026-27 | 1,096 | 77.9% | 1.6% |
| Period 1 of 2026-27 | 1,265 | 69.2% | 2.4% |
| Period 13 of 2025-26 | 1,194 | 68.7% | 1.8% |
| Period 12 of 2025-26 | 1,000 | 61.8% | 1.2% |
| Period 11 of 2025-26 | 1,014 | 65.6% | 1.7% |
| Period 10 of 2025-26 | 950 | 65.9% | 3.4% |
| Period 9 of 2025-26 | 1,095 | 63.3% | 3.2% |
| Period 8 of 2025-26 | 1,096 | 62.4% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Lockerbie | 14,465 | 56.2% | 4.8% |
| Longniddry | 14,468 | 86.6% | 0.8% |
| North Berwick | 14,571 | 91.6% | 0.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out