ScotRail at Carnoustie
How this operator is doing here
ScotRail had 13,898 scheduled stops at Carnoustie in the 13 periods to Period 7 of 2026-27, 98% of the station's total. 68.9% of recorded arrivals came within three minutes and 1.9% of stops were cancelled.
ScotRail trains at Carnoustie also serve Golf Street (0.9 km west, – on time, 3.7% cancelled), Barry Links (2.6 km west, – on time, 3.7% cancelled), Monifieth (7.3 km west, – on time, 2.2% cancelled), Balmossie (8.7 km west, – on time, 3.7% cancelled), Arbroath (9.7 km north-east, 71.8% on time, 1.7% cancelled) and Broughty Ferry (11.0 km west, 76.6% on time, 2.1% cancelled), which are the stations on its network closest to Carnoustie.
Within 30 km of here, ScotRail runs best at Dundee, 17.0 km west (81.4%), and worst at Arbroath, 9.7 km north-east (71.8%).
The busiest ScotRail station within 30 km of Carnoustie is Dundee, 17.0 km west, with about 124 scheduled stops a day.
Of the 1 operators with enough records at Carnoustie, ScotRail is the most punctual, at 68.9%.
ScotRail at Carnoustie has slipped a little, from 71.7% within three minutes in the previous 13 periods to 68.9% in the latest 13, a fall of 2.8 percentage points. Cancellations fell to 1.9% of scheduled stops from 2.7%, which is 0.8 percentage points fewer.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,072 | 66.6% | 0.8% |
| Period 6 of 2026-27 | 1,071 | 75.5% | 0.9% |
| Period 5 of 2026-27 | 1,072 | 69.5% | 2.2% |
| Period 4 of 2026-27 | 1,072 | 73.0% | 2.3% |
| Period 3 of 2026-27 | 1,072 | 75.7% | 1.4% |
| Period 2 of 2026-27 | 1,072 | 77.8% | 1.6% |
| Period 1 of 2026-27 | 1,243 | 69.3% | 2.4% |
| Period 13 of 2025-26 | 1,168 | 68.8% | 1.7% |
| Period 12 of 2025-26 | 981 | 61.7% | 1.2% |
| Period 11 of 2025-26 | 1,002 | 65.6% | 1.6% |
| Period 10 of 2025-26 | 930 | 66.1% | 3.4% |
| Period 9 of 2025-26 | 1,071 | 63.1% | 3.3% |
| Period 8 of 2025-26 | 1,072 | 62.1% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Carnoustie
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Caledonian Sleeper | 284 | – | – |
| LNER | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out