North Berwick
NBWScotlandManaged by ScotRail
How this station is performing
North Berwick had 14,571 scheduled stops to Period 7 of 2026-27, about 40 a day. 91.6% of recorded arrivals were within three minutes of the timetable and 0.9% of scheduled stops were cancelled.
North Berwick opened on 17 June 1850, 176 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, North Berwick is the newest; the oldest, Drem, opened in 1846.
The nearest stations to North Berwick are Drem (6.6 km south-west), East Linton (8.8 km south-east), Longniddry (13.3 km south-west), Dunbar (15.0 km south-east) and Prestonpans (19.1 km south-west). 2 stations lie within 10 km in all. At 91.6%, North Berwick is more punctual than every one of them; the best of the five, Prestonpans, manages 87.1%.
North Berwick takes its name from a town called North Berwick, home to about 7,840 people, and the station stands 0.9 km from its centre.
Across the whole run of data, the weakest four-week period for North Berwick was Period 10 of 2023-24, at 79.4%, some time before the latest year. The strongest was Period 13 of 2024-25, at 96.7%, and the two are 17.3 percentage points apart.
Compared with 3 stations of a similar size in Scotland, North Berwick is the most punctual, at 91.6%. The comparison group includes Dunbar (74.9%), Longniddry (86.6%) and Lockerbie (56.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 14,571 | 91.6% | 0.9% |
Operators with their own page for this station are linked to it.
Late train at North Berwick? Delay Repay
These operators call at North Berwick and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,148 | 89.9% | 1.3% |
| Period 6 of 2026-27 | 1,150 | 93.6% | 0.9% |
| Period 5 of 2026-27 | 1,160 | 89.4% | 0.3% |
| Period 4 of 2026-27 | 1,148 | 89.3% | 1.9% |
| Period 3 of 2026-27 | 1,148 | 91.6% | 1.7% |
| Period 2 of 2026-27 | 1,112 | 91.0% | 0.6% |
| Period 1 of 2026-27 | 1,253 | 92.3% | 0.8% |
| Period 13 of 2025-26 | 1,200 | 94.4% | 0.3% |
| Period 12 of 2025-26 | 1,092 | 93.4% | 0.5% |
| Period 11 of 2025-26 | 1,092 | 91.4% | 0.6% |
| Period 10 of 2025-26 | 940 | 89.9% | 1.0% |
| Period 9 of 2025-26 | 1,064 | 91.2% | 0.8% |
| Period 8 of 2025-26 | 1,064 | 93.4% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Dunbar | 14,572 | 74.9% | 1.7% |
| Longniddry | 14,468 | 86.6% | 0.8% |
| Lockerbie | 14,465 | 56.2% | 4.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out