How this operator is doing here
LNER had 665 scheduled stops at Brough in the 13 periods to Period 7 of 2026-27, 1% of the station's total. 69.0% of recorded arrivals came within three minutes and 5.6% of stops were cancelled.
LNER trains at Brough also serve Hull (15.3 km east, 79.3% on time, 5.6% cancelled), Selby (32.5 km west, 71.9% on time, 7.3% cancelled), York (42.4 km north-west, 61.6% on time, 2.7% cancelled), Doncaster (43.5 km south-west, 66.0% on time, 2.8% cancelled), Retford (52.0 km south-west, 72.6% on time, 3.5% cancelled) and Lincoln (55.7 km south, 89.5% on time, 5.9% cancelled), which are the stations on its network closest to Brough.
The busiest LNER station within 30 km of Brough is Hull, 15.3 km east, with about 2 scheduled stops a day.
LNER ranks 3rd of the 4 operators with enough records at Brough, on 69.0%.
LNER cancels more at Brough than elsewhere: 5.6% of scheduled stops, against 2.9% across its network and 2.3% for every operator at the station.
Over three full railway years LNER at Brough has got worse each time, from 84.2% within three minutes in 2023-24 to 84.1% in 2024-25 and 76.0% in 2025-26.
Alongside LNER, the other operators at Brough are Northern (71.3%, 72% of stops), TransPennine Express (79.2%, 20% of stops) and Hull Trains (68.6%, 7% of stops), so passengers here can compare several services.
Period by period
See how LNER Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 43 | – | – |
| Period 6 of 2026-27 | 48 | – | – |
| Period 5 of 2026-27 | 51 | – | – |
| Period 4 of 2026-27 | 52 | – | – |
| Period 3 of 2026-27 | 46 | – | – |
| Period 2 of 2026-27 | 53 | – | – |
| Period 1 of 2026-27 | 60 | 67.3% | 8.3% |
| Period 13 of 2025-26 | 41 | – | – |
| Period 12 of 2025-26 | 43 | – | – |
| Period 11 of 2025-26 | 45 | – | – |
| Period 10 of 2025-26 | 48 | – | – |
| Period 9 of 2025-26 | 64 | 70.5% | 4.7% |
| Period 8 of 2025-26 | 71 | 69.1% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Brough
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 46,985 | 71.3% | 2.5% |
| TransPennine Express | 13,169 | 79.2% | 2.0% |
| Hull Trains | 4,890 | 68.6% | 0.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out