Northern at Brough
All trains at BroughNorthern across BritainYorkshire and The Humber
How this operator is doing here
Northern had 46,985 scheduled stops at Brough in the 13 periods to Period 7 of 2026-27, 72% of the station's total. 71.3% of recorded arrivals came within three minutes and 2.5% of stops were cancelled.
Northern trains at Brough also serve Ferriby (4.8 km east, 77.6% on time, 3.4% cancelled), Broomfleet (6.4 km west, 75.6% on time, 4.5% cancelled), Hessle (9.0 km east, 80.6% on time, 3.3% cancelled), Gilberdyke (10.4 km west, 75.7% on time, 2.6% cancelled), Cottingham (12.8 km north-east, 72.1% on time, 3.5% cancelled) and Eastrington (14.1 km west, 76.4% on time, 1.7% cancelled), which are the stations on its network closest to Brough.
Within 30 km of here, Northern runs best at Scunthorpe, 16.4 km south (91.8%), and worst at Cottingham, 12.8 km north-east (72.1%).
The busiest Northern station within 30 km of Brough is Hull, 15.3 km east, with about 149 scheduled stops a day.
Northern ranks 2nd of the 4 operators with enough records at Brough, on 71.3%.
For Northern, Brough is the 421st best of 493 ranked stations. Its 71.3% here is 7.3 percentage points below the 78.6% across the whole network.
Over three full railway years Northern at Brough has got worse each time, from 75.5% within three minutes in 2023-24 to 74.1% in 2024-25 and 72.4% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,531 | 69.8% | 1.8% |
| Period 6 of 2026-27 | 3,578 | 73.8% | 2.3% |
| Period 5 of 2026-27 | 3,529 | 72.6% | 3.4% |
| Period 4 of 2026-27 | 3,576 | 69.5% | 5.2% |
| Period 3 of 2026-27 | 3,529 | 72.6% | 2.7% |
| Period 2 of 2026-27 | 3,634 | 71.0% | 1.9% |
| Period 1 of 2026-27 | 4,153 | 78.7% | 1.7% |
| Period 13 of 2025-26 | 3,963 | 79.1% | 1.6% |
| Period 12 of 2025-26 | 3,529 | 76.4% | 1.4% |
| Period 11 of 2025-26 | 3,552 | 72.4% | 2.7% |
| Period 10 of 2025-26 | 3,250 | 70.5% | 2.9% |
| Period 9 of 2025-26 | 3,581 | 54.7% | 3.2% |
| Period 8 of 2025-26 | 3,580 | 63.4% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Brough
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 13,169 | 79.2% | 2.0% |
| Hull Trains | 4,890 | 68.6% | 0.6% |
| LNER | 665 | 69.0% | 5.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out