Brough
BUHYorkshire and The HumberManaged by TransPennine Express
How this station is performing
Brough had 65,709 scheduled stops to Period 7 of 2026-27, about 180 a day. 72.6% of recorded arrivals were within three minutes of the timetable and 2.3% of scheduled stops were cancelled.
Brough opened on 2 July 1840, 186 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Brough is the oldest; the next oldest, Ferriby, dates from 1840.
The nearest stations to Brough are Ferriby (4.8 km east), Broomfleet (6.4 km west), Hessle (9.0 km east), Barton-on-Humber (9.8 km south-east) and Gilberdyke (10.4 km west). 4 stations lie within 10 km in all. At 72.6%, Brough is less punctual than all of them; the best of the five, Hessle, manages 80.6%.
Brough is one of 10 stations named after a town called Brough; this one stands 0.3 km from its centre.
4 operators call at Brough: Northern (71.3%, 72% of stops), TransPennine Express (79.2%, 20% of stops), Hull Trains (68.6%, 7% of stops) and LNER (69.0%, 1% of stops). The operator you travel with matters: TransPennine Express reaches 79.2% within three minutes while Hull Trains manages 68.6%, a gap of 10.6 percentage points.
1 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Brough on 72.6%. The comparison group includes Bradford Interchange (69.8%), Halifax (71.7%) and Bradford Forster Square (92.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 46,985 | 71.3% | 2.5% |
| TransPennine Express | 13,169 | 79.2% | 2.0% |
| Hull Trains | 4,890 | 68.6% | 0.6% |
| LNER | 665 | 69.0% | 5.6% |
Operators with their own page for this station are linked to it.
Late train at Brough? Delay Repay
These operators call at Brough and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,972 | 70.8% | 1.4% |
| Period 6 of 2026-27 | 5,027 | 74.7% | 2.1% |
| Period 5 of 2026-27 | 4,960 | 73.2% | 3.3% |
| Period 4 of 2026-27 | 5,028 | 71.3% | 4.2% |
| Period 3 of 2026-27 | 4,985 | 74.8% | 2.1% |
| Period 2 of 2026-27 | 5,094 | 73.1% | 1.9% |
| Period 1 of 2026-27 | 5,828 | 79.3% | 1.6% |
| Period 13 of 2025-26 | 5,548 | 79.6% | 1.6% |
| Period 12 of 2025-26 | 4,918 | 76.9% | 1.5% |
| Period 11 of 2025-26 | 4,910 | 73.0% | 2.6% |
| Period 10 of 2025-26 | 4,503 | 71.3% | 2.6% |
| Period 9 of 2025-26 | 4,974 | 57.6% | 3.0% |
| Period 8 of 2025-26 | 4,962 | 66.4% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bradford Interchange | 65,259 | 69.8% | 3.3% |
| Halifax | 67,403 | 71.7% | 3.7% |
| Bradford Forster Square | 60,778 | 92.9% | 1.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out