TransPennine Express had 13,169 scheduled stops at Brough in the 13 periods to Period 7 of 2026-27, 20% of the station's total. 79.2% of recorded arrivals came within three minutes and 2.0% of stops were cancelled.
TransPennine Express trains at Brough also serve Gilberdyke (10.4 km west, – on time, – cancelled), Hull (15.3 km east, 84.6% on time, 2.0% cancelled), Scunthorpe (16.4 km south, 70.4% on time, 2.8% cancelled), Althorpe (18.8 km south-west, 57.1% on time, 0.0% cancelled), Howden (19.0 km west, 71.2% on time, 2.3% cancelled) and Barnetby (20.2 km south-east, 68.2% on time, 3.0% cancelled), which are the stations on its network closest to Brough.
Within 30 km of here, TransPennine Express runs best at Hull, 15.3 km east (84.6%), and worst at Barnetby, 20.2 km south-east (68.2%).
The busiest TransPennine Express station within 30 km of Brough is Hull, 15.3 km east, with about 36 scheduled stops a day.
Of the 4 operators with enough records at Brough, TransPennine Express is the most punctual, at 79.2%.
For TransPennine Express, Brough is the 6th best of 77 ranked stations. Its 79.2% here is 10.4 percentage points above the 68.8% across the whole network.
Over three full railway years TransPennine Express at Brough has improved each time, from 78.8% within three minutes in 2023-24 to 79.3% in 2024-25 and 80.3% in 2025-26.
Period by period
See how TransPennine Express Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,013 | 77.4% | 0.8% |
| Period 6 of 2026-27 | 1,026 | 80.7% | 1.6% |
| Period 5 of 2026-27 | 1,007 | 77.1% | 3.9% |
| Period 4 of 2026-27 | 1,018 | 79.0% | 2.0% |
| Period 3 of 2026-27 | 1,022 | 84.1% | 0.8% |
| Period 2 of 2026-27 | 1,028 | 81.3% | 2.2% |
| Period 1 of 2026-27 | 1,181 | 83.1% | 1.4% |
| Period 13 of 2025-26 | 1,131 | 83.1% | 1.9% |
| Period 12 of 2025-26 | 1,014 | 81.8% | 1.9% |
| Period 11 of 2025-26 | 952 | 76.5% | 3.3% |
| Period 10 of 2025-26 | 868 | 76.7% | 2.4% |
| Period 9 of 2025-26 | 976 | 66.8% | 2.6% |
| Period 8 of 2025-26 | 933 | 79.4% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Brough
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 46,985 | 71.3% | 2.5% |
| Hull Trains | 4,890 | 68.6% | 0.6% |
| LNER | 665 | 69.0% | 5.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out