Halifax
HFXYorkshire and The HumberManaged by Northern Trains
How this station is performing
Halifax had 67,403 scheduled stops to Period 7 of 2026-27, about 185 a day. 71.7% of recorded arrivals were within three minutes of the timetable and 3.7% of scheduled stops were cancelled.
Halifax opened on 1 July 1844, 182 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Sowerby Bridge is the oldest (1840) and Deighton the newest (1871), with Halifax in between.
The nearest stations to Halifax are Sowerby Bridge (3.8 km west), Brighouse (5.5 km south-east), Low Moor (7.4 km north-east), Mytholmroyd (8.5 km west) and Deighton (8.9 km south-east). 6 stations lie within 10 km in all. Of the five, Brighouse is the most punctual at 76.2% and Sowerby Bridge the least at 58.6%, with Halifax on 71.7%.
Halifax takes its name from a market town called Halifax, home to about 104,100 people, and the station stands 0.8 km from its centre.
2 operators call at Halifax: Northern (72.0%, 96% of stops) and Grand Central (64.9%, 4% of stops). The operator you travel with matters: Northern reaches 72.0% within three minutes while Grand Central manages 64.9%, a gap of 7.1 percentage points.
2 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Halifax on 71.7%. The comparison group includes Brough (72.6%), Bradford Interchange (69.8%) and Hull (78.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 64,695 | 72.0% | 3.7% |
| Grand Central | 2,708 | 64.9% | 2.4% |
Operators with their own page for this station are linked to it.
Late train at Halifax? Delay Repay
These operators call at Halifax and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,419 | 70.0% | 2.4% |
| Period 6 of 2026-27 | 4,952 | 73.9% | 3.4% |
| Period 5 of 2026-27 | 5,003 | 73.1% | 3.4% |
| Period 4 of 2026-27 | 5,084 | 74.2% | 3.8% |
| Period 3 of 2026-27 | 4,986 | 68.7% | 3.1% |
| Period 2 of 2026-27 | 5,586 | 70.3% | 3.0% |
| Period 1 of 2026-27 | 5,928 | 79.4% | 3.4% |
| Period 13 of 2025-26 | 5,589 | 78.0% | 3.0% |
| Period 12 of 2025-26 | 5,056 | 73.4% | 3.6% |
| Period 11 of 2025-26 | 5,096 | 74.5% | 4.1% |
| Period 10 of 2025-26 | 4,644 | 73.1% | 4.9% |
| Period 9 of 2025-26 | 4,942 | 58.4% | 5.8% |
| Period 8 of 2025-26 | 5,118 | 63.1% | 4.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Brough | 65,709 | 72.6% | 2.3% |
| Bradford Interchange | 65,259 | 69.8% | 3.3% |
| Hull | 72,948 | 78.3% | 2.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out