Bridge of Orchy
BROScotlandManaged by ScotRail
How this station is performing
Bridge of Orchy has usable figures for 9 of the last 13 four-week periods to Period 7 of 2026-27, covering 2,318 scheduled stops, about 6 a day. In those periods 67.5% of stops arrived within three minutes of the timetable and 0.7% of scheduled stops were cancelled.
Bridge of Orchy opened on 7 August 1894, 132 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Bridge of Orchy is the newest; the oldest, Tyndrum Lower, opened in 1873.
The nearest stations to Bridge of Orchy are Tyndrum Lower (9.7 km south), Upper Tyndrum (9.8 km south), Crianlarich (16.6 km south-east), Dalmally (18.6 km south-west) and Loch Awe (21.3 km south-west). 2 stations lie within 10 km in all. Of the five, Dalmally is the most punctual at 78.2% and Crianlarich the least at 60.4%, with Bridge of Orchy on 67.5%.
Bridge of Orchy takes its name from a Village called Bridge of Orchy, home to about 152 people, and the station stands 0.4 km from its centre.
2 of 3 stations of a similar size in Scotland are more punctual than Bridge of Orchy on 67.5%. The comparison group includes Rannoch (70.3%), Spean Bridge (77.5%) and Upper Tyndrum (67.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 2,037 | 67.6% | 0.6% |
| Caledonian Sleeper | 281 | – | – |
Operators with their own page for this station are linked to it.
Late train at Bridge of Orchy? Delay Repay
These operators call at Bridge of Orchy and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 179 | – | 1.1% |
| Period 6 of 2026-27 | 182 | 74.8% | 1.1% |
| Period 5 of 2026-27 | 184 | 76.6% | 0.0% |
| Period 4 of 2026-27 | 181 | 52.7% | 0.0% |
| Period 3 of 2026-27 | 181 | 62.1% | 0.0% |
| Period 2 of 2026-27 | 184 | 48.1% | 0.0% |
| Period 1 of 2026-27 | 211 | 74.3% | 0.5% |
| Period 13 of 2025-26 | 202 | 67.5% | 0.0% |
| Period 12 of 2025-26 | 180 | – | 0.6% |
| Period 11 of 2025-26 | 173 | 78.0% | 2.3% |
| Period 10 of 2025-26 | 150 | – | 2.0% |
| Period 9 of 2025-26 | 134 | – | 1.5% |
| Period 8 of 2025-26 | 177 | 74.7% | 1.1% |
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Rannoch | 2,318 | 70.3% | 0.7% |
| Spean Bridge | 2,318 | 77.5% | 0.7% |
| Upper Tyndrum | 2,318 | 67.2% | 0.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out