ScotRail at Bridge of Orchy
All trains at Bridge of OrchyScotRail across BritainScotland
How this operator is doing here
ScotRail had 2,037 scheduled stops at Bridge of Orchy in the 13 periods to Period 7 of 2026-27, 88% of the station's total. 67.6% of recorded arrivals came within three minutes and 0.6% of stops were cancelled.
ScotRail trains at Bridge of Orchy also serve Tyndrum Lower (9.7 km south, 63.4% on time, 1.1% cancelled), Upper Tyndrum (9.8 km south, 68.4% on time, 0.6% cancelled), Crianlarich (16.6 km south-east, 60.4% on time, 0.9% cancelled), Dalmally (18.6 km south-west, 78.2% on time, 1.4% cancelled), Loch Awe (21.3 km south-west, 77.8% on time, 1.4% cancelled) and Rannoch (22.1 km north-east, 70.3% on time, 0.6% cancelled), which are the stations on its network closest to Bridge of Orchy.
Within 30 km of here, ScotRail runs best at Dalmally, 18.6 km south-west (78.2%), and worst at Crianlarich, 16.6 km south-east (60.4%).
The busiest ScotRail station within 30 km of Bridge of Orchy is Crianlarich, 16.6 km south-east, with about 17 scheduled stops a day.
ScotRail at Bridge of Orchy improved sharply over the past year. In the latest 13 periods 67.6% of stops came within three minutes of the timetable, up 7.5 percentage points from 60.1% in the 13 before. Cancellations held steady at 0.6% of scheduled stops, against 0.7% before.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 156 | – | 0.0% |
| Period 6 of 2026-27 | 160 | 74.5% | 1.3% |
| Period 5 of 2026-27 | 160 | 78.0% | 0.0% |
| Period 4 of 2026-27 | 157 | 53.2% | 0.0% |
| Period 3 of 2026-27 | 160 | 63.1% | 0.0% |
| Period 2 of 2026-27 | 160 | 47.6% | 0.0% |
| Period 1 of 2026-27 | 183 | 73.9% | 0.0% |
| Period 13 of 2025-26 | 176 | 68.0% | 0.0% |
| Period 12 of 2025-26 | 160 | 69.9% | 0.6% |
| Period 11 of 2025-26 | 160 | 78.9% | 1.9% |
| Period 10 of 2025-26 | 135 | – | 2.2% |
| Period 9 of 2025-26 | 116 | 59.6% | 1.7% |
| Period 8 of 2025-26 | 154 | 75.3% | 1.3% |
Other operators at Bridge of Orchy
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Caledonian Sleeper | 281 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out