Rannoch
RANScotlandManaged by ScotRail
How this station is performing
Rannoch had 2,318 scheduled stops to Period 7 of 2026-27, about 6 a day. 70.3% of recorded arrivals were within three minutes of the timetable and 0.7% of scheduled stops were cancelled.
Rannoch opened on 7 August 1894, 132 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Rannoch is the oldest; the next oldest, Corrour, dates from 1894.
Rannoch is remote: its nearest neighbours are Corrour (10.8 km north-west), Bridge of Orchy (22.1 km south-west), Tulloch (23.3 km north), Roy Bridge (27.5 km north-west) and Upper Tyndrum (29.0 km south). Of the five, Roy Bridge is the most punctual at 79.1% and Upper Tyndrum the least at 67.2%, with Rannoch on 70.3%.
Across the whole run of data, the weakest four-week period for Rannoch was Period 8 of 2023-24, at 48.5%, some time before the latest year. The strongest was Period 12 of 2023-24, at 81.9%, and the two are 33.4 percentage points apart.
1 of 3 stations of a similar size in Scotland are more punctual than Rannoch on 70.3%. The comparison group includes Bridge of Orchy (67.5%), Spean Bridge (77.5%) and Upper Tyndrum (67.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 2,037 | 70.3% | 0.6% |
| Caledonian Sleeper | 281 | – | – |
Operators with their own page for this station are linked to it.
Late train at Rannoch? Delay Repay
These operators call at Rannoch and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 179 | 74.4% | 1.1% |
| Period 6 of 2026-27 | 182 | 72.1% | 1.1% |
| Period 5 of 2026-27 | 184 | 70.7% | 0.0% |
| Period 4 of 2026-27 | 181 | 60.0% | 0.0% |
| Period 3 of 2026-27 | 181 | 67.4% | 0.0% |
| Period 2 of 2026-27 | 184 | 61.4% | 0.0% |
| Period 1 of 2026-27 | 211 | 76.7% | 0.5% |
| Period 13 of 2025-26 | 202 | 68.8% | 0.0% |
| Period 12 of 2025-26 | 180 | 74.9% | 0.6% |
| Period 11 of 2025-26 | 173 | 76.8% | 2.3% |
| Period 10 of 2025-26 | 150 | 72.8% | 2.0% |
| Period 9 of 2025-26 | 134 | 64.9% | 1.5% |
| Period 8 of 2025-26 | 177 | 71.4% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bridge of Orchy | 2,318 | 67.5% | 0.7% |
| Spean Bridge | 2,318 | 77.5% | 0.7% |
| Upper Tyndrum | 2,318 | 67.2% | 0.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out