Upper Tyndrum
UTYScotlandManaged by ScotRail
How this station is performing
Upper Tyndrum has usable figures for 9 of the last 13 four-week periods to Period 7 of 2026-27, covering 2,318 scheduled stops, about 6 a day. In those periods 67.2% of stops arrived within three minutes of the timetable and 0.7% of scheduled stops were cancelled.
Upper Tyndrum opened on 7 August 1894, 132 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Upper Tyndrum is the newest; the oldest, Tyndrum Lower, opened in 1873.
The nearest stations to Upper Tyndrum are Tyndrum Lower (0.6 km west), Crianlarich (7.2 km south-east), Bridge of Orchy (9.8 km north), Ardlui (14.8 km south) and Dalmally (17.6 km west). 3 stations lie within 10 km in all. Of the five, Dalmally is the most punctual at 78.2% and Crianlarich the least at 60.4%, with Upper Tyndrum on 67.2%.
For Upper Tyndrum, the weakest four-week period in the data is a recent one: Period 2 of 2026-27, when only 47.7% of stops arrived within three minutes of the timetable. The strongest was Period 11 of 2025-26, at 78.5%, which is 30.8 percentage points higher.
Compared with 3 stations of a similar size in Scotland, Upper Tyndrum is the least punctual, at 67.2%. All of them are ahead, including Bridge of Orchy (67.5%), Rannoch (70.3%) and Spean Bridge (77.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 2,037 | 68.4% | 0.6% |
| Caledonian Sleeper | 281 | – | – |
Operators with their own page for this station are linked to it.
Late train at Upper Tyndrum? Delay Repay
These operators call at Upper Tyndrum and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 179 | – | 1.1% |
| Period 6 of 2026-27 | 182 | 78.0% | 1.1% |
| Period 5 of 2026-27 | 184 | 73.8% | 0.0% |
| Period 4 of 2026-27 | 181 | 51.9% | 0.0% |
| Period 3 of 2026-27 | 181 | 61.0% | 0.0% |
| Period 2 of 2026-27 | 184 | 47.7% | 0.0% |
| Period 1 of 2026-27 | 211 | 74.6% | 0.5% |
| Period 13 of 2025-26 | 202 | 67.5% | 0.0% |
| Period 12 of 2025-26 | 180 | – | 0.6% |
| Period 11 of 2025-26 | 173 | 78.5% | 2.3% |
| Period 10 of 2025-26 | 150 | – | 2.0% |
| Period 9 of 2025-26 | 134 | – | 1.5% |
| Period 8 of 2025-26 | 177 | 71.4% | 1.1% |
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bridge of Orchy | 2,318 | 67.5% | 0.7% |
| Rannoch | 2,318 | 70.3% | 0.7% |
| Spean Bridge | 2,318 | 77.5% | 0.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out