Barnehurst
BNHLondonManaged by Southeastern
How this station is performing
Barnehurst had 67,797 scheduled stops to Period 7 of 2026-27, about 186 a day. 85.8% of recorded arrivals were within three minutes of the timetable and 2.0% of scheduled stops were cancelled.
Barnehurst opened on 1 May 1895, 131 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Erith is the oldest (1849) and Slade Green the newest (1900), with Barnehurst in between.
The nearest stations to Barnehurst are Bexleyheath (1.8 km west), Erith (2.1 km north-east), Slade Green (2.1 km east), Crayford (2.3 km south-east) and Bexley (2.9 km south). 34 stations lie within 10 km in all. Of the five, Erith is the most punctual at 92.2% and Bexleyheath the least at 84.1%, with Barnehurst on 85.8%.
Barnehurst takes its name from an area of London called Barnehurst, home to about 10,418 people, and the station stands 0.8 km from its centre.
2 operators call at Barnehurst: Southeastern (85.8%, 99% of stops) and GTR (88.7%, 1% of stops). They are close together, with GTR leading on 88.7% and Southeastern trailing on 85.8%, a gap of 2.9 percentage points.
Compared with 3 stations of a similar size in London, Barnehurst is the least punctual, at 85.8%. All of them are ahead, including Drayton Park (90.6%), Beckenham Junction (88.4%) and Wandsworth Town (89.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 67,410 | 85.8% | 2.0% |
| GTR | 387 | 88.7% | 1.3% |
Operators with their own page for this station are linked to it.
Late train at Barnehurst? Delay Repay
These operators call at Barnehurst and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,988 | 86.5% | 1.4% |
| Period 6 of 2026-27 | 5,158 | 84.9% | 1.2% |
| Period 5 of 2026-27 | 4,779 | 83.5% | 2.6% |
| Period 4 of 2026-27 | 5,294 | 88.2% | 1.5% |
| Period 3 of 2026-27 | 5,584 | 83.6% | 3.1% |
| Period 2 of 2026-27 | 4,990 | 84.4% | 5.4% |
| Period 1 of 2026-27 | 6,173 | 88.9% | 1.9% |
| Period 13 of 2025-26 | 5,210 | 87.5% | 1.3% |
| Period 12 of 2025-26 | 6,308 | 85.7% | 1.6% |
| Period 11 of 2025-26 | 4,918 | 86.5% | 1.2% |
| Period 10 of 2025-26 | 4,115 | 87.0% | 1.7% |
| Period 9 of 2025-26 | 5,321 | 84.7% | 1.2% |
| Period 8 of 2025-26 | 4,959 | 83.5% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Drayton Park | 67,933 | 90.6% | 4.6% |
| Beckenham Junction | 67,415 | 88.4% | 2.6% |
| Wandsworth Town | 67,396 | 89.9% | 4.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out