Drayton Park
DYPLondonManaged by Govia Thameslink Railway (Great Northern)
How this station is performing
Drayton Park had 67,933 scheduled stops to Period 7 of 2026-27, about 187 a day. 90.6% of recorded arrivals were within three minutes of the timetable and 4.6% of scheduled stops were cancelled.
Drayton Park opened on 14 February 1904, 122 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Drayton Park is the newest; the oldest, Highbury and Islington, opened in 1850.
The nearest stations to Drayton Park are Highbury and Islington (0.8 km south), Canonbury (1.0 km south-east), Caledonian Road and Barnsbury (1.3 km south-west), Finsbury Park (1.3 km north) and Essex Road (1.5 km south-east). 119 stations lie within 10 km in all. Of the five, Essex Road is the most punctual at 91.8% and Caledonian Road and Barnsbury the least at 79.3%, with Drayton Park on 90.6%.
For Drayton Park, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 78.0% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 95.1%, which is 17.1 percentage points higher.
Compared with 3 stations of a similar size in London, Drayton Park is the most punctual, at 90.6%. The comparison group includes Barnehurst (85.8%), Mill Hill Broadway (70.4%) and Beckenham Junction (88.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 67,933 | 90.6% | 4.6% |
Operators with their own page for this station are linked to it.
Late train at Drayton Park? Delay Repay
These operators call at Drayton Park and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,357 | 89.0% | 4.9% |
| Period 6 of 2026-27 | 5,317 | 78.0% | 9.0% |
| Period 5 of 2026-27 | 5,212 | 90.8% | 6.8% |
| Period 4 of 2026-27 | 5,475 | 90.8% | 5.9% |
| Period 3 of 2026-27 | 5,095 | 92.9% | 6.9% |
| Period 2 of 2026-27 | 5,041 | 91.7% | 5.2% |
| Period 1 of 2026-27 | 5,908 | 93.5% | 3.9% |
| Period 13 of 2025-26 | 5,834 | 93.4% | 2.8% |
| Period 12 of 2025-26 | 4,872 | 93.8% | 1.9% |
| Period 11 of 2025-26 | 5,148 | 93.7% | 2.8% |
| Period 10 of 2025-26 | 4,319 | 93.1% | 2.8% |
| Period 9 of 2025-26 | 5,114 | 86.4% | 4.5% |
| Period 8 of 2025-26 | 5,241 | 89.6% | 2.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Barnehurst | 67,797 | 85.8% | 2.0% |
| Mill Hill Broadway | 68,295 | 70.4% | 6.6% |
| Beckenham Junction | 67,415 | 88.4% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out