Southeastern at Barnehurst
How this operator is doing here
Southeastern had 67,410 scheduled stops at Barnehurst in the 13 periods to Period 7 of 2026-27, 99% of the station's total. 85.8% of recorded arrivals came within three minutes and 2.0% of stops were cancelled.
Southeastern trains at Barnehurst also serve Bexleyheath (1.8 km west, 84.1% on time, 2.0% cancelled), Erith (2.1 km north-east, 92.2% on time, 1.6% cancelled), Slade Green (2.1 km east, 90.8% on time, 1.6% cancelled), Crayford (2.3 km south-east, 88.4% on time, 1.4% cancelled), Bexley (2.9 km south, 87.1% on time, 1.4% cancelled) and Belvedere (3.1 km north, 92.6% on time, 1.6% cancelled), which are the stations on its network closest to Barnehurst.
Within 30 km of here, Southeastern runs best at Sundridge Park, 11.1 km south-west (99.4%), and worst at Hildenborough, 28.2 km south (70.3%).
The busiest Southeastern station within 30 km of Barnehurst is London Bridge, 17.5 km west, with about 912 scheduled stops a day.
Of the 2 operators with enough records at Barnehurst, Southeastern is the least punctual, at 85.8%.
For Southeastern, Barnehurst is the 66th best of 173 ranked stations. Its 85.8% here is 1.6 percentage points above the 84.2% across the whole network.
Southeastern at Barnehurst has not moved in one direction over three full railway years: 87.8% within three minutes in 2023-24, 85.5% in 2024-25 and 86.5% in 2025-26.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,988 | 86.5% | 1.4% |
| Period 6 of 2026-27 | 5,158 | 84.9% | 1.2% |
| Period 5 of 2026-27 | 4,717 | 83.4% | 2.7% |
| Period 4 of 2026-27 | 5,294 | 88.2% | 1.5% |
| Period 3 of 2026-27 | 5,382 | 83.5% | 3.1% |
| Period 2 of 2026-27 | 4,990 | 84.4% | 5.4% |
| Period 1 of 2026-27 | 6,173 | 88.9% | 1.9% |
| Period 13 of 2025-26 | 5,210 | 87.5% | 1.3% |
| Period 12 of 2025-26 | 6,308 | 85.7% | 1.6% |
| Period 11 of 2025-26 | 4,857 | 86.5% | 1.2% |
| Period 10 of 2025-26 | 4,115 | 87.0% | 1.7% |
| Period 9 of 2025-26 | 5,259 | 84.6% | 1.3% |
| Period 8 of 2025-26 | 4,959 | 83.5% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Barnehurst
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 387 | 88.7% | 1.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out