Wandsworth Town
WNTLondonManaged by South Western Railway
How this station is performing
Wandsworth Town had 67,396 scheduled stops to Period 7 of 2026-27, about 185 a day. 89.9% of recorded arrivals were within three minutes of the timetable and 4.4% of scheduled stops were cancelled.
Wandsworth Town opened on 27 July 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Wandsworth Town is the oldest; the next oldest, Putney, dates from 1846.
The nearest stations to Wandsworth Town are Clapham Junction (1.3 km east), Imperial Wharf (1.6 km north), Putney (1.9 km west), Earlsfield (2.0 km south) and Wandsworth Common (2.3 km south-east). 109 stations lie within 10 km in all. Of the five, Wandsworth Common is the most punctual at 93.0% and Earlsfield the least at 81.2%, with Wandsworth Town on 89.9%.
Wandsworth Town is named after Wandsworth, an area of London, home to about 18,072 people, but the station stands 0.7 km from its centre.
Across the whole run of data, the weakest four-week period for Wandsworth Town was Period 9 of 2024-25, at 72.0%, some time before the latest year. The strongest was Period 13 of 2025-26, at 93.8%, and the two are 21.8 percentage points apart. Cancellations peaked at 9.0% of scheduled stops in Period 2 of 2026-27, against 4.4% over the latest 13 periods.
Compared with 3 stations of a similar size in London, Wandsworth Town is the most punctual, at 89.9%. The comparison group includes Beckenham Junction (88.4%), Barnehurst (85.8%) and Eltham (83.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 67,396 | 89.9% | 4.4% |
Operators with their own page for this station are linked to it.
Late train at Wandsworth Town? Delay Repay
These operators call at Wandsworth Town and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,344 | 91.1% | 3.4% |
| Period 6 of 2026-27 | 5,250 | 91.1% | 3.4% |
| Period 5 of 2026-27 | 5,268 | 90.0% | 4.4% |
| Period 4 of 2026-27 | 5,140 | 89.5% | 3.6% |
| Period 3 of 2026-27 | 4,932 | 89.0% | 4.3% |
| Period 2 of 2026-27 | 4,668 | 88.6% | 9.0% |
| Period 1 of 2026-27 | 5,916 | 93.3% | 3.2% |
| Period 13 of 2025-26 | 5,851 | 93.8% | 2.5% |
| Period 12 of 2025-26 | 5,198 | 92.2% | 5.5% |
| Period 11 of 2025-26 | 5,210 | 91.7% | 3.3% |
| Period 10 of 2025-26 | 4,252 | 90.1% | 5.2% |
| Period 9 of 2025-26 | 5,179 | 84.1% | 3.8% |
| Period 8 of 2025-26 | 5,188 | 82.7% | 6.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Beckenham Junction | 67,415 | 88.4% | 2.6% |
| Barnehurst | 67,797 | 85.8% | 2.0% |
| Eltham | 66,870 | 83.5% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out