Beckenham Junction
BKJLondonManaged by Southeastern
How this station is performing
Beckenham Junction had 67,415 scheduled stops to Period 7 of 2026-27, about 185 a day. 88.4% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Beckenham Junction opened on 1 January 1857, 169 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Beckenham Junction is the oldest; the next oldest, Lower Sydenham, dates from 1857.
The nearest stations to Beckenham Junction are New Beckenham (0.9 km north-west), Clock House (1.1 km west), Ravensbourne (1.3 km east), Kent House (1.3 km west) and Lower Sydenham (1.6 km north). 89 stations lie within 10 km in all. Of the five, Clock House is the most punctual at 94.4% and Kent House the least at 85.3%, with Beckenham Junction on 88.4%.
Beckenham Junction is named after Beckenham, an area of London, home to about 46,844 people, but the station stands 0.5 km from its centre.
2 operators call at Beckenham Junction: Southeastern (84.4%, 71% of stops) and GTR (98.1%, 29% of stops). The operator you travel with matters: GTR reaches 98.1% within three minutes while Southeastern manages 84.4%, a gap of 13.7 percentage points.
2 of 3 stations of a similar size in London are more punctual than Beckenham Junction on 88.4%. The comparison group includes Wandsworth Town (89.9%), Barnehurst (85.8%) and Drayton Park (90.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 47,542 | 84.4% | 2.3% |
| GTR | 19,873 | 98.1% | 3.1% |
Operators with their own page for this station are linked to it.
Late train at Beckenham Junction? Delay Repay
These operators call at Beckenham Junction and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,325 | 89.2% | 1.7% |
| Period 6 of 2026-27 | 5,311 | 87.3% | 3.0% |
| Period 5 of 2026-27 | 4,186 | 83.8% | 3.3% |
| Period 4 of 2026-27 | 5,328 | 90.7% | 2.5% |
| Period 3 of 2026-27 | 5,361 | 87.7% | 3.3% |
| Period 2 of 2026-27 | 5,173 | 90.2% | 3.5% |
| Period 1 of 2026-27 | 5,843 | 93.4% | 1.9% |
| Period 13 of 2025-26 | 5,841 | 91.8% | 2.1% |
| Period 12 of 2025-26 | 5,290 | 91.3% | 1.6% |
| Period 11 of 2025-26 | 5,148 | 89.2% | 1.7% |
| Period 10 of 2025-26 | 4,105 | 86.6% | 3.8% |
| Period 9 of 2025-26 | 5,092 | 83.9% | 2.6% |
| Period 8 of 2025-26 | 5,412 | 81.8% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Wandsworth Town | 67,396 | 89.9% | 4.4% |
| Barnehurst | 67,797 | 85.8% | 2.0% |
| Drayton Park | 67,933 | 90.6% | 4.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out