How this operator is doing here
LNER had 37,296 scheduled stops at York in the 13 periods to Period 7 of 2026-27, 22% of the station's total. 61.6% of recorded arrivals came within three minutes and 2.7% of stops were cancelled.
LNER trains at York also serve Selby (19.6 km south, 71.9% on time, 7.3% cancelled), Harrogate (29.3 km west, 87.5% on time, 6.1% cancelled), Leeds (35.0 km south-west, 70.1% on time, 3.8% cancelled), Thirsk (35.2 km north-west, – on time, – cancelled), Horsforth (37.3 km west, 73.1% on time, 6.2% cancelled) and Wakefield Westgate (40.9 km south-west, 64.7% on time, 3.7% cancelled), which are the stations on its network closest to York.
The busiest LNER station within 30 km of York is Harrogate, 29.3 km west, with about 11 scheduled stops a day.
LNER ranks 3rd of the 5 operators with enough records at York, on 61.6%.
For LNER, York is the 31st best of 35 ranked stations. Its 61.6% here is 6.0 percentage points below the 67.6% across the whole network.
LNER at York has slipped sharply. 61.6% of stops came within three minutes of the timetable in the latest 13 periods, 9.3 percentage points worse than the 70.9% recorded in the 13 before. Cancellations rose to 2.7% of scheduled stops from 1.6%, which is 1.1 percentage points more.
Period by period
See how LNER Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,959 | 61.1% | 1.1% |
| Period 6 of 2026-27 | 2,997 | 59.9% | 3.4% |
| Period 5 of 2026-27 | 3,014 | 56.9% | 3.5% |
| Period 4 of 2026-27 | 3,020 | 57.4% | 1.7% |
| Period 3 of 2026-27 | 3,012 | 59.5% | 2.6% |
| Period 2 of 2026-27 | 2,827 | 59.3% | 3.4% |
| Period 1 of 2026-27 | 3,416 | 57.4% | 3.7% |
| Period 13 of 2025-26 | 3,087 | 65.2% | 2.3% |
| Period 12 of 2025-26 | 2,917 | 68.9% | 2.9% |
| Period 11 of 2025-26 | 2,991 | 62.4% | 3.4% |
| Period 10 of 2025-26 | 2,588 | 62.2% | 2.6% |
| Period 9 of 2025-26 | 2,358 | 65.2% | 3.0% |
| Period 8 of 2025-26 | 2,110 | 69.1% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at York
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 56,724 | 75.0% | 2.4% |
| TransPennine Express | 54,030 | 75.7% | 1.8% |
| CrossCountry | 15,278 | 58.4% | 3.6% |
| Grand Central | 4,008 | 59.5% | 2.2% |
| Lumo (East Coast) | 4 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out