Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Grand Central at York

All trains at YorkGrand Central across BritainYorkshire and The Humber

On time, last 13 periods59.5%Whole station: 70.4%
Cancelled2.2%Whole station: 2.4%
Scheduled stops4,008Of 167,340 at the station

How this operator is doing here

Grand Central had 4,008 scheduled stops at York in the 13 periods to Period 7 of 2026-27, 2% of the station's total. 59.5% of recorded arrivals came within three minutes and 2.2% of stops were cancelled.

Grand Central trains at York also serve Pontefract Monkhill (32.0 km south-west, 56.2% on time, 2.9% cancelled), Thirsk (35.2 km north-west, 65.9% on time, 1.7% cancelled), Wakefield Kirkgate (40.4 km south-west, 60.3% on time, 2.0% cancelled), Wakefield Westgate (40.9 km south-west, – on time, – cancelled), Bradford Interchange (46.9 km south-west, 68.1% on time, 2.2% cancelled) and Northallerton (47.4 km north-west, 60.4% on time, 1.8% cancelled), which are the stations on its network closest to York.

Grand Central ranks 4th of the 5 operators with enough records at York, on 59.5%.

For Grand Central, York is the 12th best of 17 ranked stations. Its 59.5% here is 2.7 percentage points below the 62.2% across the whole network.

Cancellations of Grand Central at York are near its usual level: 2.2% of scheduled stops, against 2.3% across its network and 2.4% for every operator at the station.

Over three full railway years Grand Central at York has improved each time, from 58.7% within three minutes in 2023-24 to 62.3% in 2024-25 and 62.8% in 2025-26.

Period by period

40%60%80%2023-242024-252025-262026-27Period 1 of 2023-24: 71.6%Period 2 of 2023-24: 66.4%Period 3 of 2023-24: 54.3%Period 4 of 2023-24: 55.6%Period 5 of 2023-24: 55.2%Period 6 of 2023-24: 56.7%Period 7 of 2023-24: 60.5%Period 8 of 2023-24: 54.1%Period 9 of 2023-24: 54.2%Period 10 of 2023-24: 44.9%Period 11 of 2023-24: 56.6%Period 12 of 2023-24: 62.8%Period 13 of 2023-24: 66.1%Period 1 of 2024-25: 67.9%Period 2 of 2024-25: 66.8%Period 3 of 2024-25: 69.7%Period 4 of 2024-25: 57.4%Period 5 of 2024-25: 57.9%Period 6 of 2024-25: 64.4%Period 7 of 2024-25: 63.9%Period 8 of 2024-25: 66.7%Period 9 of 2024-25: 52.0%Period 10 of 2024-25: 60.7%Period 11 of 2024-25: 51.4%Period 12 of 2024-25: 61.6%Period 13 of 2024-25: 68.4%Period 1 of 2025-26: 66.6%Period 2 of 2025-26: 58.4%Period 3 of 2025-26: 61.9%Period 4 of 2025-26: 58.6%Period 5 of 2025-26: 56.7%Period 6 of 2025-26: 62.5%Period 7 of 2025-26: 66.6%Period 8 of 2025-26: 61.2%Period 9 of 2025-26: 56.7%Period 10 of 2025-26: 66.2%Period 11 of 2025-26: 67.0%Period 12 of 2025-26: 68.6%Period 13 of 2025-26: 65.9%Period 1 of 2026-27: 55.9%Period 2 of 2026-27: 43.1%Period 3 of 2026-27: 59.6%Period 4 of 2026-27: 51.7%Period 5 of 2026-27: 58.7%Period 6 of 2026-27: 58.7%Period 7 of 2026-27: 61.4%
This pageGreat Britain
0%2%4%6%8%Period 1 of 2023-24: 1.5%Period 2 of 2023-24: 6.6%Period 3 of 2023-24: 4.9%Period 4 of 2023-24: 3.0%Period 5 of 2023-24: 5.0%Period 6 of 2023-24: 5.2%Period 7 of 2023-24: 2.5%Period 8 of 2023-24: 7.6%Period 9 of 2023-24: 2.9%Period 10 of 2023-24: 4.7%Period 11 of 2023-24: 3.8%Period 12 of 2023-24: 4.0%Period 13 of 2023-24: 3.1%Period 1 of 2024-25: 0.9%Period 2 of 2024-25: 2.7%Period 3 of 2024-25: 2.4%Period 4 of 2024-25: 1.2%Period 5 of 2024-25: 2.1%Period 6 of 2024-25: 2.2%Period 7 of 2024-25: 3.2%Period 8 of 2024-25: 1.3%Period 9 of 2024-25: 2.0%Period 10 of 2024-25: 3.2%Period 11 of 2024-25: 3.3%Period 12 of 2024-25: 3.1%Period 13 of 2024-25: 1.3%Period 1 of 2025-26: 1.0%Period 2 of 2025-26: 1.9%Period 3 of 2025-26: 2.2%Period 4 of 2025-26: 2.7%Period 5 of 2025-26: 2.1%Period 6 of 2025-26: 0.3%Period 7 of 2025-26: 1.5%Period 8 of 2025-26: 2.3%Period 9 of 2025-26: 3.8%Period 10 of 2025-26: 1.8%Period 11 of 2025-26: 2.9%Period 12 of 2025-26: 1.2%Period 13 of 2025-26: 0.3%Period 1 of 2026-27: 1.9%Period 2 of 2026-27: 3.2%Period 3 of 2026-27: 2.7%Period 4 of 2026-27: 0.6%Period 5 of 2026-27: 3.4%Period 6 of 2026-27: 1.6%Period 7 of 2026-27: 2.4%2023-242024-252025-262026-27

See how Grand Central Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2732761.4%2.4%
Period 6 of 2026-2731758.7%1.6%
Period 5 of 2026-2732858.7%3.4%
Period 4 of 2026-2732751.7%0.6%
Period 3 of 2026-2732859.6%2.7%
Period 2 of 2026-2727943.1%3.2%
Period 1 of 2026-2736555.9%1.9%
Period 13 of 2025-2632465.9%0.3%
Period 12 of 2025-2625868.6%1.2%
Period 11 of 2025-2631567.0%2.9%
Period 10 of 2025-2628366.2%1.8%
Period 9 of 2025-2629356.7%3.8%
Period 8 of 2025-2626461.2%2.3%

Time of year

50%60%70%80%90%P1: 65.3%1P2: 59.1%2P3: 61.5%3P4: 55.8%4P5: 57.2%5P6: 60.6%6P7: 63.1%7P8: 60.8%8P9: 54.3%9P10: 57.8%10P11: 58.5%11P12: 64.3%12P13: 66.8%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at York

OperatorScheduled stopsWithin 3 minCancelled
Northern56,72475.0%2.4%
TransPennine Express54,03075.7%1.8%
LNER37,29661.6%2.7%
CrossCountry15,27858.4%3.6%
Lumo (East Coast)4––

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out