CrossCountry at York
All trains at YorkCrossCountry across BritainYorkshire and The Humber
How this operator is doing here
CrossCountry had 15,278 scheduled stops at York in the 13 periods to Period 7 of 2026-27, 9% of the station's total. 58.4% of recorded arrivals came within three minutes and 3.6% of stops were cancelled.
CrossCountry trains at York also serve Leeds (35.0 km south-west, 61.3% on time, 4.8% cancelled), Wakefield Westgate (40.9 km south-west, 53.4% on time, 4.9% cancelled), Doncaster (48.6 km south, 57.1% on time, 5.7% cancelled), Sheffield (68.9 km south, 51.7% on time, 3.4% cancelled), Darlington (69.2 km north-west, 66.1% on time, 3.7% cancelled) and Chesterfield (82.9 km south, 54.2% on time, 2.6% cancelled), which are the stations on its network closest to York.
Of the 5 operators with enough records at York, CrossCountry is the least punctual, at 58.4%.
For CrossCountry, York is the 73rd best of 99 ranked stations. Its 58.4% here is 4.8 percentage points below the 63.2% across the whole network.
Cancellations of CrossCountry at York are near its usual level: 3.6% of scheduled stops, against 5.9% across its network and 2.4% for every operator at the station.
CrossCountry at York has slipped a little, from 61.2% within three minutes in the previous 13 periods to 58.4% in the latest 13, a fall of 2.8 percentage points. Cancellations rose to 3.6% of scheduled stops from 3.1%, which is 0.5 percentage points more.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,249 | 58.0% | 3.8% |
| Period 6 of 2026-27 | 1,290 | 59.2% | 6.0% |
| Period 5 of 2026-27 | 1,283 | 55.8% | 3.0% |
| Period 4 of 2026-27 | 1,294 | 53.0% | 3.6% |
| Period 3 of 2026-27 | 1,191 | 58.4% | 4.2% |
| Period 2 of 2026-27 | 1,219 | 54.2% | 4.8% |
| Period 1 of 2026-27 | 1,428 | 58.8% | 2.5% |
| Period 13 of 2025-26 | 1,278 | 64.9% | 3.5% |
| Period 12 of 2025-26 | 1,065 | 66.5% | 1.6% |
| Period 11 of 2025-26 | 979 | 66.8% | 2.5% |
| Period 10 of 2025-26 | 953 | 58.9% | 5.8% |
| Period 9 of 2025-26 | 1,107 | 49.9% | 3.2% |
| Period 8 of 2025-26 | 942 | 56.8% | 2.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at York
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 56,724 | 75.0% | 2.4% |
| TransPennine Express | 54,030 | 75.7% | 1.8% |
| LNER | 37,296 | 61.6% | 2.7% |
| Grand Central | 4,008 | 59.5% | 2.2% |
| Lumo (East Coast) | 4 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out