Patterton
PTTScotlandManaged by ScotRail
How this station is performing
Patterton had 25,397 scheduled stops to Period 7 of 2026-27, about 70 a day. 96.6% of recorded arrivals were within three minutes of the timetable and 1.2% of scheduled stops were cancelled.
Patterton opened on 1 May 1903, 123 years before the latest figures here, and has not been moved since. The First World War closed Patterton on 1 January 1917, and it reopened on 1 February 1919. Among the 5 stations nearest to it with a known opening date, Kennishead is the oldest (1848) and Priesthill and Darnley the newest (1990), with Patterton in between.
The nearest stations to Patterton are Whitecraigs (1.5 km east), Priesthill and Darnley (2.5 km north), Kennishead (2.6 km north), Thornliebank (2.7 km north-east) and Williamwood (2.8 km east). 51 stations lie within 10 km in all. Of the five, Williamwood is the most punctual at 97.4% and Priesthill and Darnley the least at 92.9%, with Patterton on 96.6%.
Patterton takes its name from a suburb called Patterton, and the station stands 0.2 km from its centre.
Compared with 3 stations of a similar size in Scotland, Patterton is the least punctual, at 96.6%. All of them are ahead, including Muirend (97.4%), Neilston (97.6%) and Williamwood (97.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 25,397 | 96.6% | 1.2% |
Operators with their own page for this station are linked to it.
Late train at Patterton? Delay Repay
These operators call at Patterton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,040 | 96.8% | 0.6% |
| Period 6 of 2026-27 | 2,040 | 97.6% | 0.7% |
| Period 5 of 2026-27 | 1,780 | 97.3% | 0.6% |
| Period 4 of 2026-27 | 2,040 | 96.9% | 0.8% |
| Period 3 of 2026-27 | 2,040 | 96.5% | 3.3% |
| Period 2 of 2026-27 | 2,035 | 97.1% | 1.2% |
| Period 1 of 2026-27 | 2,338 | 96.7% | 0.6% |
| Period 13 of 2025-26 | 1,080 | 97.6% | 2.1% |
| Period 12 of 2025-26 | 2,040 | 96.1% | 0.6% |
| Period 11 of 2025-26 | 2,040 | 96.6% | 0.3% |
| Period 10 of 2025-26 | 1,841 | 96.6% | 1.3% |
| Period 9 of 2025-26 | 2,043 | 94.9% | 2.8% |
| Period 8 of 2025-26 | 2,040 | 96.2% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Muirend | 25,397 | 97.4% | 1.1% |
| Neilston | 25,397 | 97.6% | 1.2% |
| Williamwood | 25,397 | 97.4% | 1.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out