Whitstable
WHISouth EastManaged by Southeastern
How this station is performing
Whitstable had 27,846 scheduled stops to Period 7 of 2026-27, about 76 a day. 74.6% of recorded arrivals were within three minutes of the timetable and 1.9% of scheduled stops were cancelled.
Whitstable opened on 1 August 1860. It was moved to the site it uses now on 1 January 1915. Among the 5 stations nearest to it with a known opening date, Canterbury West is the oldest (1846) and Chestfield and Swalecliffe the newest (1930), with Whitstable in between.
The nearest stations to Whitstable are Chestfield and Swalecliffe (2.3 km east), Herne Bay (5.9 km east), Canterbury West (8.6 km south), Sturry (8.7 km south-east) and Canterbury East (9.7 km south). 5 stations lie within 10 km in all. Of the five, Chestfield and Swalecliffe is the most punctual at 78.8% and Canterbury East the least at 71.1%, with Whitstable on 74.6%.
Whitstable takes its name from a town called Whitstable, home to about 30,195 people, and the station stands 0.7 km from its centre.
Compared with 3 stations of a similar size in South East, Whitstable is the least punctual, at 74.6%. All of them are ahead, including Salfords (Surrey) (77.4%), Pevensey and Westham (76.6%) and Littlehaven (79.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 27,846 | 74.6% | 1.9% |
Operators with their own page for this station are linked to it.
Late train at Whitstable? Delay Repay
These operators call at Whitstable and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,133 | 63.1% | 2.6% |
| Period 6 of 2026-27 | 2,197 | 68.4% | 2.0% |
| Period 5 of 2026-27 | 2,254 | 69.8% | 1.6% |
| Period 4 of 2026-27 | 2,238 | 77.4% | 1.6% |
| Period 3 of 2026-27 | 2,162 | 69.0% | 3.1% |
| Period 2 of 2026-27 | 2,054 | 67.0% | 2.1% |
| Period 1 of 2026-27 | 2,463 | 84.8% | 2.2% |
| Period 13 of 2025-26 | 2,322 | 82.0% | 2.5% |
| Period 12 of 2025-26 | 1,983 | 84.9% | 1.5% |
| Period 11 of 2025-26 | 2,007 | 82.3% | 1.2% |
| Period 10 of 2025-26 | 1,935 | 78.2% | 1.1% |
| Period 9 of 2025-26 | 2,056 | 71.1% | 1.1% |
| Period 8 of 2025-26 | 2,042 | 71.0% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Salfords (Surrey) | 27,825 | 77.4% | 8.5% |
| Pevensey and Westham | 27,811 | 76.6% | 4.9% |
| Littlehaven | 27,787 | 79.1% | 6.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out