Pevensey and Westham
PEVSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Pevensey and Westham had 27,811 scheduled stops to Period 7 of 2026-27, about 76 a day. 76.6% of recorded arrivals were within three minutes of the timetable and 4.9% of scheduled stops were cancelled.
Pevensey and Westham opened on 27 June 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Pevensey and Westham is the oldest; the next oldest, Polegate, dates from 1846.
The nearest stations to Pevensey and Westham are Pevensey Bay (1.3 km east), Hampden Park (Sussex) (3.9 km south-west), Normans Bay (4.7 km east), Polegate (5.5 km west) and Eastbourne (6.0 km south-west). 7 stations lie within 10 km in all. At 76.6%, Pevensey and Westham is less punctual than all of them; the best of the five, Hampden Park (Sussex), manages 80.0%.
Pevensey and Westham is named after Pevensey, a Village, home to about 3,307 people, but the station stands 1.0 km from its centre.
Pevensey and Westham has slipped sharply. 76.6% of stops came within three minutes of the timetable in the latest 13 periods, 5.8 percentage points worse than the 82.4% recorded in the 13 before. Cancellations rose to 4.9% of scheduled stops from 3.7%, which is 1.2 percentage points more.
2 of 3 stations of a similar size in South East are more punctual than Pevensey and Westham on 76.6%. The comparison group includes Salfords (Surrey) (77.4%), Littlehaven (79.1%) and Whitstable (74.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 27,811 | 76.6% | 4.9% |
Operators with their own page for this station are linked to it.
Late train at Pevensey and Westham? Delay Repay
These operators call at Pevensey and Westham and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,205 | 63.3% | 7.1% |
| Period 6 of 2026-27 | 2,054 | 46.3% | 7.9% |
| Period 5 of 2026-27 | 1,798 | 72.0% | 7.4% |
| Period 4 of 2026-27 | 2,207 | 77.3% | 2.9% |
| Period 3 of 2026-27 | 2,118 | 79.1% | 6.4% |
| Period 2 of 2026-27 | 2,157 | 81.7% | 8.1% |
| Period 1 of 2026-27 | 2,224 | 85.2% | 5.4% |
| Period 13 of 2025-26 | 2,447 | 87.3% | 3.4% |
| Period 12 of 2025-26 | 2,110 | 83.2% | 2.5% |
| Period 11 of 2025-26 | 2,228 | 83.0% | 2.6% |
| Period 10 of 2025-26 | 1,966 | 80.4% | 2.8% |
| Period 9 of 2025-26 | 2,104 | 77.1% | 3.3% |
| Period 8 of 2025-26 | 2,193 | 75.7% | 3.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Salfords (Surrey) | 27,825 | 77.4% | 8.5% |
| Littlehaven | 27,787 | 79.1% | 6.8% |
| Whitstable | 27,846 | 74.6% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out