Salfords (Surrey)
SAFSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Salfords (Surrey) had 27,825 scheduled stops to Period 7 of 2026-27, about 76 a day. 77.4% of recorded arrivals were within three minutes of the timetable and 8.5% of scheduled stops were cancelled.
Salfords (Surrey) opened on 17 July 1932, 94 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Salfords (Surrey) is the newest; the oldest, Horley, opened in 1841.
The nearest stations to Salfords (Surrey) are Earlswood (Surrey) (3.0 km north), Nutfield (3.5 km north-east), Horley (3.6 km south), Redhill (4.3 km north) and Gatwick Airport (5.0 km south). 10 stations lie within 10 km in all. Of the five, Nutfield is the most punctual at 82.5% and Gatwick Airport the least at 71.6%, with Salfords (Surrey) on 77.4%.
Salfords (Surrey) is named after Salfords, a Village, but the station stands 0.4 km from its centre.
Cancellations are a particular problem at Salfords (Surrey). 8.5% of scheduled stops did not happen, 3.1 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2348th of 2,374.
1 of 3 stations of a similar size in South East are more punctual than Salfords (Surrey) on 77.4%. The comparison group includes Pevensey and Westham (76.6%), Whitstable (74.6%) and Littlehaven (79.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 27,825 | 77.4% | 8.5% |
Operators with their own page for this station are linked to it.
Late train at Salfords (Surrey)? Delay Repay
These operators call at Salfords (Surrey) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,212 | 76.6% | 6.5% |
| Period 6 of 2026-27 | 2,161 | 71.1% | 10.8% |
| Period 5 of 2026-27 | 2,010 | 67.0% | 11.6% |
| Period 4 of 2026-27 | 2,150 | 73.5% | 13.0% |
| Period 3 of 2026-27 | 1,924 | 76.2% | 5.8% |
| Period 2 of 2026-27 | 2,175 | 83.1% | 5.1% |
| Period 1 of 2026-27 | 2,468 | 83.7% | 5.0% |
| Period 13 of 2025-26 | 2,419 | 84.4% | 4.3% |
| Period 12 of 2025-26 | 2,215 | 80.3% | 12.0% |
| Period 11 of 2025-26 | 1,889 | 74.4% | 7.6% |
| Period 10 of 2025-26 | 1,854 | 81.1% | 9.9% |
| Period 9 of 2025-26 | 2,204 | 72.2% | 14.3% |
| Period 8 of 2025-26 | 2,144 | 78.4% | 5.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Pevensey and Westham | 27,811 | 76.6% | 4.9% |
| Whitstable | 27,846 | 74.6% | 1.9% |
| Littlehaven | 27,787 | 79.1% | 6.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out