Whinhill
WNLScotlandManaged by ScotRail
How this station is performing
Whinhill had 20,030 scheduled stops to Period 7 of 2026-27, about 55 a day. 94.4% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Whinhill opened on 14 May 1990, 36 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Greenock Central is the oldest (1841) and Drumfrochar the newest (1998), with Whinhill in between.
The nearest stations to Whinhill are Greenock Central (0.8 km north-west), Cartsdyke (1.0 km north-east), Drumfrochar (1.6 km west), Greenock West (1.6 km north-west) and Bogston (2.2 km east). 15 stations lie within 10 km in all. Of the five, Cartsdyke is the most punctual at 96.1% and Greenock West the least at 93.8%, with Whinhill on 94.4%.
In Scotland, Whinhill ranks 39th of 313 ranked stations. Its 94.4% is 6.7 percentage points better than the area median of 87.7%.
Across the whole run of data, the weakest four-week period for Whinhill was Period 8 of 2024-25, at 88.6%, some time before the latest year. The strongest was Period 6 of 2026-27, at 97.9%, and the two are 9.3 percentage points apart. Cancellations peaked at 7.1% of scheduled stops in Period 7 of 2023-24, against 1.8% over the latest 13 periods.
2 of 3 stations of a similar size in Scotland are more punctual than Whinhill on 94.4%. The comparison group includes Inverkip (97.4%), Wemyss Bay (96.6%) and Corkerhill (92.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 20,030 | 94.4% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Whinhill? Delay Repay
These operators call at Whinhill and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,596 | 93.7% | 2.6% |
| Period 6 of 2026-27 | 1,596 | 97.9% | 0.6% |
| Period 5 of 2026-27 | 1,596 | 96.5% | 2.4% |
| Period 4 of 2026-27 | 1,596 | 93.9% | 0.9% |
| Period 3 of 2026-27 | 1,596 | 95.2% | 1.1% |
| Period 2 of 2026-27 | 1,596 | 91.5% | 0.9% |
| Period 1 of 2026-27 | 1,844 | 97.0% | 4.0% |
| Period 13 of 2025-26 | 1,167 | 95.5% | 1.2% |
| Period 12 of 2025-26 | 1,255 | 92.1% | 0.5% |
| Period 11 of 2025-26 | 1,596 | 95.7% | 1.6% |
| Period 10 of 2025-26 | 1,400 | 92.1% | 2.6% |
| Period 9 of 2025-26 | 1,596 | 91.4% | 3.8% |
| Period 8 of 2025-26 | 1,596 | 93.2% | 0.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Inverkip | 20,030 | 97.4% | 1.8% |
| Wemyss Bay | 20,030 | 96.6% | 1.8% |
| Corkerhill | 20,167 | 92.8% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out