Corkerhill
CKHScotlandManaged by ScotRail
How this station is performing
Corkerhill had 20,167 scheduled stops to Period 7 of 2026-27, about 55 a day. 92.8% of recorded arrivals were within three minutes of the timetable and 1.4% of scheduled stops were cancelled.
Corkerhill opened on 30 July 1990, 36 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Corkerhill is the newest; the oldest, Cardonald, opened in 1843.
The nearest stations to Corkerhill are Mosspark (0.9 km north-west), Cardonald (1.7 km north), Crookston (2.0 km west), Dumbreck (2.3 km east) and Hillington East (2.3 km north-west). 75 stations lie within 10 km in all. Of the five, Hillington East is the most punctual at 96.0% and Crookston the least at 92.6%, with Corkerhill on 92.8%.
Across the whole run of data, the weakest four-week period for Corkerhill was Period 8 of 2023-24, at 83.4%, some time before the latest year. The strongest was Period 5 of 2024-25, at 97.2%, and the two are 13.8 percentage points apart.
1 of 3 stations of a similar size in Scotland are more punctual than Corkerhill on 92.8%. The comparison group includes Crookston (92.6%), Hawkhead (92.2%) and Mosspark (93.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 20,167 | 92.8% | 1.4% |
Operators with their own page for this station are linked to it.
Late train at Corkerhill? Delay Repay
These operators call at Corkerhill and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,624 | 93.8% | 0.9% |
| Period 6 of 2026-27 | 1,624 | 96.0% | 0.5% |
| Period 5 of 2026-27 | 1,624 | 95.2% | 0.6% |
| Period 4 of 2026-27 | 1,456 | 93.0% | 1.0% |
| Period 3 of 2026-27 | 1,616 | 94.7% | 1.7% |
| Period 2 of 2026-27 | 1,624 | 88.8% | 1.4% |
| Period 1 of 2026-27 | 1,880 | 93.9% | 2.4% |
| Period 13 of 2025-26 | 832 | 95.4% | 1.4% |
| Period 12 of 2025-26 | 1,624 | 93.1% | 0.7% |
| Period 11 of 2025-26 | 1,624 | 94.1% | 0.5% |
| Period 10 of 2025-26 | 1,388 | 91.3% | 1.6% |
| Period 9 of 2025-26 | 1,627 | 87.7% | 4.5% |
| Period 8 of 2025-26 | 1,624 | 90.5% | 0.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out