Wemyss Bay
WMSScotlandManaged by ScotRail
How this station is performing
Wemyss Bay had 20,030 scheduled stops to Period 7 of 2026-27, about 55 a day. 96.6% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Wemyss Bay opened on 15 May 1865, 161 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Wemyss Bay is the oldest; the next oldest, Inverkip, dates from 1865.
The nearest stations to Wemyss Bay are Inverkip (3.5 km north), Branchton (8.9 km north-east), Largs (9.4 km south), Drumfrochar (10.3 km north-east) and Gourock (10.5 km north-east). 3 stations lie within 10 km in all. Of the five, Inverkip is the most punctual at 97.4% and Largs the least at 83.5%, with Wemyss Bay on 96.6%.
Wemyss Bay takes its name from a Village called Wemyss Bay, home to about 2,430 people, and the station stands 0.9 km from its centre.
Wemyss Bay is among the most punctual stations in Britain. Its 96.6% puts it 49th out of 2,374 ranked stations, with 48 ahead of it and 2,325 behind, and 12.7 percentage points above the national median of 83.9%.
1 of 3 stations of a similar size in Scotland are more punctual than Wemyss Bay on 96.6%. The comparison group includes Inverkip (97.4%), Whinhill (94.4%) and Corkerhill (92.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 20,030 | 96.6% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Wemyss Bay? Delay Repay
These operators call at Wemyss Bay and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,596 | 96.9% | 2.6% |
| Period 6 of 2026-27 | 1,596 | 98.6% | 0.5% |
| Period 5 of 2026-27 | 1,596 | 98.0% | 2.3% |
| Period 4 of 2026-27 | 1,596 | 96.5% | 0.9% |
| Period 3 of 2026-27 | 1,596 | 97.0% | 1.0% |
| Period 2 of 2026-27 | 1,596 | 96.2% | 0.9% |
| Period 1 of 2026-27 | 1,844 | 97.9% | 4.0% |
| Period 13 of 2025-26 | 1,167 | 96.4% | 1.2% |
| Period 12 of 2025-26 | 1,255 | 96.0% | 0.5% |
| Period 11 of 2025-26 | 1,596 | 96.9% | 1.7% |
| Period 10 of 2025-26 | 1,400 | 95.0% | 2.6% |
| Period 9 of 2025-26 | 1,596 | 94.3% | 3.8% |
| Period 8 of 2025-26 | 1,596 | 95.9% | 0.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Inverkip | 20,030 | 97.4% | 1.8% |
| Whinhill | 20,030 | 94.4% | 1.8% |
| Corkerhill | 20,167 | 92.8% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out