Weston-Super-Mare
WSMSouth WestManaged by Great Western Railway
How this station is performing
Weston-Super-Mare had 32,094 scheduled stops to Period 7 of 2026-27, about 88 a day. 71.8% of recorded arrivals were within three minutes of the timetable and 3.6% of scheduled stops were cancelled.
Weston-Super-Mare opened on 14 June 1841. It was moved to the site it uses now on 1 March 1884. Of the 5 stations nearest to it with a known opening date, Weston-Super-Mare is the oldest; the next oldest, Yatton, dates from 1841.
The nearest stations to Weston-Super-Mare are Weston Milton (2.1 km east), Worle (4.6 km east), Yatton (11.3 km north-east), Highbridge and Burnham (14.1 km south) and Penarth (17.3 km north-west). 2 stations lie within 10 km in all. At 71.8%, Weston-Super-Mare is less punctual than all of them; the best of the five, Penarth, manages 96.1%.
Weston-Super-Mare takes its name from a town called Weston-super-Mare, home to about 76,143 people, and the station stands 0.6 km from its centre.
2 operators call at Weston-Super-Mare: Great Western Railway (72.1%, 98% of stops) and CrossCountry (55.9%, 2% of stops). The operator you travel with matters: Great Western Railway reaches 72.1% within three minutes while CrossCountry manages 55.9%, a gap of 16.2 percentage points.
Compared with 3 stations of a similar size in South West, Weston-Super-Mare is the most punctual, at 71.8%. The comparison group includes Tiverton Parkway (57.1%), Bradford-on-Avon (71.4%) and Chippenham (66.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 31,424 | 72.1% | 3.3% |
| CrossCountry | 670 | 55.9% | 16.3% |
Operators with their own page for this station are linked to it.
Late train at Weston-Super-Mare? Delay Repay
These operators call at Weston-Super-Mare and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,424 | 75.0% | 3.5% |
| Period 6 of 2026-27 | 2,459 | 70.3% | 2.6% |
| Period 5 of 2026-27 | 2,499 | 63.8% | 6.2% |
| Period 4 of 2026-27 | 2,495 | 67.3% | 4.8% |
| Period 3 of 2026-27 | 2,465 | 68.6% | 4.6% |
| Period 2 of 2026-27 | 2,455 | 71.9% | 3.2% |
| Period 1 of 2026-27 | 2,746 | 76.5% | 1.8% |
| Period 13 of 2025-26 | 2,689 | 77.6% | 1.7% |
| Period 12 of 2025-26 | 2,458 | 84.1% | 1.2% |
| Period 11 of 2025-26 | 2,361 | 82.6% | 2.4% |
| Period 10 of 2025-26 | 2,190 | 69.1% | 5.4% |
| Period 9 of 2025-26 | 2,497 | 60.6% | 5.0% |
| Period 8 of 2025-26 | 2,356 | 64.0% | 4.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Tiverton Parkway | 32,231 | 57.1% | 4.5% |
| Bradford-on-Avon | 31,339 | 71.4% | 4.5% |
| Chippenham | 30,719 | 66.9% | 4.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out