Great Western Railway at Weston-Super-Mare
All trains at Weston-Super-MareGreat Western Railway across BritainSouth West
How this operator is doing here
Great Western Railway had 31,424 scheduled stops at Weston-Super-Mare in the 13 periods to Period 7 of 2026-27, 98% of the station's total. 72.1% of recorded arrivals came within three minutes and 3.3% of stops were cancelled.
Great Western Railway trains at Weston-Super-Mare also serve Weston Milton (2.1 km east, 72.7% on time, 3.5% cancelled), Worle (4.6 km east, 71.8% on time, 3.1% cancelled), Yatton (11.3 km north-east, 71.9% on time, 3.2% cancelled), Highbridge and Burnham (14.1 km south, 72.8% on time, 2.9% cancelled), Nailsea and Backwell (17.6 km north-east, 73.1% on time, 3.2% cancelled) and Cardiff Central (20.5 km north-west, 67.7% on time, 3.9% cancelled), which are the stations on its network closest to Weston-Super-Mare.
Within 30 km of here, Great Western Railway runs best at St Andrews Road, 26.7 km north-east (78.6%), and worst at Newport (South Wales), 27.2 km north (66.4%).
The busiest Great Western Railway station within 30 km of Weston-Super-Mare is Bristol Temple Meads, 29.6 km north-east, with about 333 scheduled stops a day.
Great Western Railway at Weston-Super-Mare has slipped a little, from 76.4% within three minutes in the previous 13 periods to 72.1% in the latest 13, a fall of 4.3 percentage points. Cancellations fell to 3.3% of scheduled stops from 4.8%, which is 1.5 percentage points fewer.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,378 | 75.4% | 3.2% |
| Period 6 of 2026-27 | 2,403 | 70.6% | 2.4% |
| Period 5 of 2026-27 | 2,443 | 64.2% | 5.9% |
| Period 4 of 2026-27 | 2,443 | 67.7% | 4.8% |
| Period 3 of 2026-27 | 2,419 | 68.9% | 4.5% |
| Period 2 of 2026-27 | 2,399 | 72.3% | 3.1% |
| Period 1 of 2026-27 | 2,688 | 76.7% | 1.6% |
| Period 13 of 2025-26 | 2,642 | 78.0% | 1.7% |
| Period 12 of 2025-26 | 2,416 | 84.3% | 1.1% |
| Period 11 of 2025-26 | 2,306 | 82.9% | 2.0% |
| Period 10 of 2025-26 | 2,142 | 69.5% | 4.9% |
| Period 9 of 2025-26 | 2,441 | 60.6% | 4.3% |
| Period 8 of 2025-26 | 2,304 | 64.0% | 4.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Weston-Super-Mare
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 670 | 55.9% | 16.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out