Bradford-on-Avon
BOASouth WestManaged by Great Western Railway
How this station is performing
Bradford-on-Avon had 31,339 scheduled stops to Period 7 of 2026-27, about 86 a day. 71.4% of recorded arrivals were within three minutes of the timetable and 4.5% of scheduled stops were cancelled.
Bradford-on-Avon opened on 2 February 1857, 169 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Bath Spa is the oldest (1840) and Avoncliff the newest (1906), with Bradford-on-Avon in between.
The nearest stations to Bradford-on-Avon are Avoncliff (2.1 km west), Freshford (3.3 km west), Trowbridge (3.9 km south-east), Bath Spa (8.1 km north-west) and Melksham (8.4 km north-east). 7 stations lie within 10 km in all. Of the five, Avoncliff is the most punctual at 77.6% and Bath Spa the least at 68.5%, with Bradford-on-Avon on 71.4%.
Bradford-on-Avon takes its name from a town called Bradford-on-Avon, home to about 10,406 people, and the station stands 0.3 km from its centre.
Across the whole run of data, the weakest four-week period for Bradford-on-Avon was Period 9 of 2024-25, at 57.6%, some time before the latest year. The strongest was Period 11 of 2024-25, at 85.7%, and the two are 28.1 percentage points apart. Cancellations peaked at 11.7% of scheduled stops in Period 9 of 2024-25, against 4.5% over the latest 13 periods.
1 of 3 stations of a similar size in South West are more punctual than Bradford-on-Avon on 71.4%. The comparison group includes Chippenham (66.9%), Weston-Super-Mare (71.8%) and Tiverton Parkway (57.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 31,339 | 71.4% | 4.5% |
Operators with their own page for this station are linked to it.
Late train at Bradford-on-Avon? Delay Repay
These operators call at Bradford-on-Avon and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,421 | 67.7% | 3.6% |
| Period 6 of 2026-27 | 2,435 | 69.1% | 2.9% |
| Period 5 of 2026-27 | 2,292 | 64.3% | 5.5% |
| Period 4 of 2026-27 | 2,426 | 60.8% | 6.5% |
| Period 3 of 2026-27 | 2,345 | 73.2% | 9.6% |
| Period 2 of 2026-27 | 2,298 | 68.0% | 7.0% |
| Period 1 of 2026-27 | 2,573 | 79.0% | 2.2% |
| Period 13 of 2025-26 | 2,665 | 78.7% | 4.2% |
| Period 12 of 2025-26 | 2,430 | 82.5% | 1.4% |
| Period 11 of 2025-26 | 2,423 | 82.3% | 3.8% |
| Period 10 of 2025-26 | 2,218 | 71.6% | 4.2% |
| Period 9 of 2025-26 | 2,453 | 62.3% | 5.3% |
| Period 8 of 2025-26 | 2,360 | 68.6% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chippenham | 30,719 | 66.9% | 4.4% |
| Weston-Super-Mare | 32,094 | 71.8% | 3.6% |
| Tiverton Parkway | 32,231 | 57.1% | 4.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out