Chippenham
CPMSouth WestManaged by Great Western Railway
How this station is performing
Chippenham had 30,719 scheduled stops to Period 7 of 2026-27, about 84 a day. 66.9% of recorded arrivals were within three minutes of the timetable and 4.4% of scheduled stops were cancelled.
Chippenham opened on 31 May 1841, 185 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Chippenham is the oldest; the next oldest, Melksham, dates from 1848.
The nearest stations to Chippenham are Melksham (9.4 km south), Bradford-on-Avon (16.1 km south-west), Trowbridge (17.2 km south-west), Avoncliff (17.8 km south-west) and Freshford (18.5 km south-west). 1 stations lie within 10 km in all. At 66.9%, Chippenham is less punctual than all of them; the best of the five, Avoncliff, manages 77.6%.
Chippenham is one of 3 stations named after a market town called Chippenham, home to about 36,762 people; this one stands 0.4 km from its centre.
For Chippenham, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 51.5% of stops arrived within three minutes of the timetable. The strongest was Period 12 of 2025-26, at 80.7%, which is 29.2 percentage points higher. Cancellations peaked at 13.0% of scheduled stops in Period 9 of 2024-25, against 4.4% over the latest 13 periods.
Compared with 3 stations of a similar size in South West, Chippenham is the least punctual, at 66.9%. All of them are ahead, including Yatton (71.9%), Bradford-on-Avon (71.4%) and Liskeard (73.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 30,719 | 66.9% | 4.4% |
Operators with their own page for this station are linked to it.
Late train at Chippenham? Delay Repay
These operators call at Chippenham and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,506 | 73.0% | 3.8% |
| Period 6 of 2026-27 | 2,471 | 65.4% | 4.2% |
| Period 5 of 2026-27 | 2,628 | 56.6% | 6.6% |
| Period 4 of 2026-27 | 2,629 | 57.3% | 6.2% |
| Period 3 of 2026-27 | 2,607 | 65.3% | 6.6% |
| Period 2 of 2026-27 | 2,374 | 68.0% | 4.8% |
| Period 1 of 2026-27 | 2,471 | 76.4% | 2.6% |
| Period 13 of 2025-26 | 2,448 | 76.2% | 2.9% |
| Period 12 of 2025-26 | 2,248 | 80.7% | 1.5% |
| Period 11 of 2025-26 | 2,018 | 72.6% | 2.0% |
| Period 10 of 2025-26 | 1,937 | 62.3% | 6.1% |
| Period 9 of 2025-26 | 2,277 | 51.5% | 4.2% |
| Period 8 of 2025-26 | 2,105 | 63.7% | 4.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Yatton | 30,423 | 71.9% | 3.2% |
| Bradford-on-Avon | 31,339 | 71.4% | 4.5% |
| Liskeard | 30,015 | 73.8% | 5.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out