West Calder
WCLScotlandManaged by ScotRail
How this station is performing
West Calder had 19,853 scheduled stops to Period 7 of 2026-27, about 54 a day. 91.4% of recorded arrivals were within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
West Calder opened on 9 July 1869, 157 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Livingston North is the oldest (1849) and Bathgate the newest (2010), with West Calder in between.
The nearest stations to West Calder are Addiewell (2.7 km south-west), Livingston South (4.5 km north-east), Livingston North (5.5 km north), Bathgate (6.5 km north-west) and Breich (6.9 km south-west). 8 stations lie within 10 km in all. At 91.4%, West Calder is more punctual than every one of them; the best of the five, Breich, manages 90.9%.
West Calder takes its name from a Village called West Calder, home to about 3,130 people, and the station stands 0.2 km from its centre.
Across the whole run of data, the weakest four-week period for West Calder was Period 8 of 2024-25, at 81.7%, some time before the latest year. The strongest was Period 13 of 2024-25, at 94.8%, and the two are 13.1 percentage points apart. Cancellations peaked at 6.8% of scheduled stops in Period 10 of 2024-25, against 1.3% over the latest 13 periods.
2 of 3 stations of a similar size in Scotland are more punctual than West Calder on 91.4%. The comparison group includes Livingston South (90.8%), Inverkip (97.4%) and Wemyss Bay (96.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 19,853 | 91.4% | 1.3% |
Operators with their own page for this station are linked to it.
Late train at West Calder? Delay Repay
These operators call at West Calder and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,580 | 89.3% | 1.4% |
| Period 6 of 2026-27 | 1,581 | 92.3% | 0.4% |
| Period 5 of 2026-27 | 1,581 | 91.8% | 0.4% |
| Period 4 of 2026-27 | 1,517 | 91.6% | 2.4% |
| Period 3 of 2026-27 | 1,580 | 92.9% | 1.4% |
| Period 2 of 2026-27 | 1,532 | 92.0% | 0.9% |
| Period 1 of 2026-27 | 1,778 | 92.9% | 1.9% |
| Period 13 of 2025-26 | 1,126 | 93.3% | 0.7% |
| Period 12 of 2025-26 | 1,560 | 93.0% | 1.4% |
| Period 11 of 2025-26 | 1,560 | 92.2% | 1.3% |
| Period 10 of 2025-26 | 1,337 | 90.8% | 1.8% |
| Period 9 of 2025-26 | 1,561 | 87.9% | 1.9% |
| Period 8 of 2025-26 | 1,560 | 88.2% | 0.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Livingston South | 19,853 | 90.8% | 1.3% |
| Inverkip | 20,030 | 97.4% | 1.8% |
| Wemyss Bay | 20,030 | 96.6% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out